钢管混凝土系杆拱桥拱圈落架仿真分析 被引量:6

Simulation Analysis of Removing the Arch-ring's Scaffolds for Concrete-filled Steel Tube Arch Bridge
下载PDF
导出
摘要 结合天津南港铁路工程有砟轨道双线96 m钢管混凝土系杆拱桥,利用Midas Civil建立模型,通过对4种拱圈对称落架方案的对比分析,得出在拱圈落架过程中控制截面的变形值和应力值最小的方案,提出了从1/4拱肋附近逐次对称向拱脚与拱顶均衡卸落的落架方案对拱圈变形和受力更为有利,并在施工过程中取得了较好的效果。并且考虑到现场施工场地、环境以及施工技术条件限制等因素的影响,提出了3种拱圈不对称落架施工方案,为施工过程中的监测与施工安全性控制提供理论参考依据。 Combined with the double ballast track 96 m concrete-filled steel pipe arch bridge in Tianjin Nangang Railway engineering,a model is established with the Midas Civil.Through comparative analysis of four kinds of arch ring landing structure schemes,scheme with minimum control cross section deformation and stress values in the process of arch ring landing is found out.It is concluded that scheme of successive symmetric landing from a quarter of the arch rib to the arch foot and vault is more favorable to arch ring deformation and stress distribution,and good results have been achieved in the construction process.And considering factors such as construction plant,environment,construction technology and condi-tion,the author puts forward three arch ring asymmetry landing structure construction schemes to provide theoretical refer-ence for monitoring in the process of construction and construction safety control.
作者 马祥春
出处 《铁道建筑技术》 2014年第11期12-15,共4页 Railway Construction Technology
关键词 钢管混凝土 拱圈 支架拆除 变形 应力 仿真分析 concrete-filled steel tube arch ring scaffold removing deformation stress simulation analysis
  • 相关文献

参考文献3

二级参考文献7

共引文献78

同被引文献35

引证文献6

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部