期刊文献+

采用工作面超前注水法提高跨采底板巷道围岩稳定性 被引量:4

Advance Water Injection Method Used to Improve the Stability of Surrounding Rock in Floor Roadways While Mining Over-the-roadway
下载PDF
导出
摘要 在蒋庄煤矿3下煤层710工作面实际跨采工程中,为降低上部工作面超前支承压力峰值对底板巷道的影响,提出工作面超前注水法。通过分散上部工作面开采形成的超前支承压力,降低支承压力峰值,避免过大的应力峰值集中传递到底板巷道围岩而导致底板巷道围岩失稳。结果表明,超前注水后,煤体强度降低23%,底板巷道的顶底板移近量最大160mm,超前影响距离为70m,达到预期效果。 For the engineering in 710 working face in coal seam 3 of Jiangzhuang Mine,this paper put forward the “advance water injection method” to achieve the goal of reducing the advance support pressure on the floor roadway as the solution. Dispersing the advance support pressure caused by the mining of the working face reduced the pres sure peak to avoid transferring the excessive stress peak to the surrounding rock of floor roadways and thus im- proved the stability of surrounding rock. The results show that this method has achieved the desired effect,reducing the coal strength by 23% with the greatest convergence of 160 mm between the roof and floor of roadway,and the advance affecting distance is 70 m.
作者 吴士良 李烨
出处 《山东科技大学学报(自然科学版)》 CAS 2014年第6期46-50,共5页 Journal of Shandong University of Science and Technology(Natural Science)
关键词 跨巷开采 底板巷道 超前支承压力 超前注水法 围岩稳定性 over-the-roadway extraction floor roadway advance support pressure advance water injection method stability of surrounding rock
  • 相关文献

参考文献6

二级参考文献19

共引文献55

同被引文献37

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部