期刊文献+

New algorithm of mine slope reliability based on limiting state hyper-plane and its engineering application 被引量:1

New algorithm of mine slope reliability based on limiting state hyper-plane and its engineering application
下载PDF
导出
摘要 Due to the influence of joint fissure, mining intensity, designed slope angle, underground water and rainfall, the failure process of mine slope project is extremely complicated. The current safety factor calculation method has certain limitations, and it would be difficult to obtain the reliability index when the performance function of reliability analysis is implicit or has high order terms. Therefore, with the help of the logistic equation of chaos theory, a new algorithm of mine slope reliability based on limiting state hyper-plane is proposed. It is shown that by using this new reliability algorithm the calculation of partial derivative of performance function is avoided, and it has the advantages of being simple and easy to program. The new algorithm is suitable for calculating the reliability index of complex performance function containing high order terms. Furthermore, the limiting state hyper-plane models of both simplified Bishop's and Janbu's method adaptive to slope project are obtained, and have achieved satisfactory effect in the study of mine slope stability in Dexing copper open pit. Due to the influence of joint fissure, mining intensity, designed slope angle, underground water and rainfall, the failure process of mine slope project is extremely complicated. The current safety factor calculation method has certain limitations, and it would be difficult to obtain the reliability index when the performance function of reliability analysis is implicit or has high order terms. Therefore, with the help of the logistic equation of chaos theory, a new algorithm of mine slope reliability based on limiting state hyper-plane is proposed. It is shown that by using this new reliability algorithm the calculation of partial derivative of performance function is avoided, and it has the advantages of being simple and easy to program. The new algorithm is suitable for calculating the reliability index of complex performance function containing high order terms. Furthermore, the limiting state hyper-plane models of both simplified Bishop's and Janbu's method adaptive to slope project are obtained, and have achieved satisfactory effect in the study of mine slope stability in Dexing copper open pit.
出处 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第1期317-322,共6页 中南大学学报(英文版)
基金 Project(2013BAB02B05)supported by National Science and Technology Support Program of China Project(2013JSJJ029)supported by the Teacher Fund of Central South University,China Projects(51074177,41372278)supported by the National Natural Science Foundation of China
关键词 limiting state hyper-plane mine slope reliability engineering application 矿山边坡 边坡工程 超平面 算法 可靠度 可靠性分析 可靠性指标 应用