摘要
某水利枢纽引水发电洞压力钢管及岔管管径大,而且需在现场制作安装,而施工区域小,交叉作业多,管节大,吨位重,吊装环节多。文章介绍了大管径压力钢管在洞内施工区域小、施工条件不足的情况下,采取洞内轨道运输、倒装的具体措施。
Large diameter pipes were used in a water conservancy diversion tunnel penstock and bifurcated pipe, and they need to be manufactured and installed on site, further more the construction area is small, with the cross operation, big pipe section, weight lifting, many links. This paper introduces the concrete measures of rail transportation and inversion method for the large diameter pressure pipe in the construction area, construction conditions under the insufficient condition.
出处
《黑龙江水利科技》
2014年第11期52-54,共3页
Heilongjiang Hydraulic Science and Technology
关键词
引水发电洞
压力钢管
管径大
吨位大
安装
倒装法
diversion tunnel
pressure pipe
large diameter
large tonnage
installation
inversioninstallation method