摘要 核桃峪煤矿是目前甘肃陇东煤田在建的规模最大矿井,设计单位要求地质勘查部门提交采用不同计算方法对井田先期开采地段正常涌水量和最大涌水量进行预测。通过分析矿井水文地质条件,分别采用了大井法、水平廊道法和比拟法对矿井涌水量做出了预测,并对预测结果进行了对比分析。结果表明:(1)解析法采用实测影响半径计算的涌水量与比拟法的结果相对接近,选用较大值,即为比拟法的结果,先期开采地段最大涌水量为28 800m3/d,正常涌水量为20 160m3/d;(2)在矿井涌水量预测中,用经验公式计算的承压水影响半径偏小,导致预算的涌水量结果偏大。在对各种预测方法应用条件分析比较的前提下,建议若有条件采用比拟法,应首选比拟法预算矿井涌水量。 The Hetaoyu coalmine is the largest coalmine under construction in the Longdong coalfield, Gansu at present. The designer has demanded the geological exploration party to carry out prediction of normal and maximum mine water inflows of mining district in advance through different estimation methods. Through mine hydrogeological condition analysis, virtual large-diameter well method, horizontal collector gallery method and analogue method have been used to predict mine water inflow respectively and then comparatively analyzed prediction results. The result has shown: (1) The analytic method uses measured radius of influence estimated water inflow relatively close to analogue method estimated, using the larger value--a result from analogue method predicted maximum mine inflow of mining district in advance is 28 800m^3/d, normal mine inflow 20 160m^3/d. (2) In mine water inflow prediction, confined water radius of influence from empirical formula is on the small side, thus brings on estimated mine inflow on the large side. Under the premise of comparative analysis of each method applied conditions, if conditions permitted, the analogue method should be preferred to estimate mine water inflow.
作者 张子祥
出处 《中国煤炭地质》 2015年第2期32-36,56,共6页 Coal Geology of China
关键词 矿井涌水量预测 大井法 水平廊道法 比拟法 对比分析 mine water inflow prediction virtual large-diameter well method horizontal collector gallery method analogue method comparative analysis
  • 相关文献

参考文献4

  • 1张子祥,张成功,李晓君,等.甘肃宁正矿区核桃峪井田勘探报告[R].兰卅,2008.
  • 2国家安全生产监督管理总局.煤矿床水文地质、工程地质、环境地质勘查评价标准(MT/T1091-2008)[s].北京,2009.
  • 3房佩贤 卫中鼎 廖资生 等.专门水文地质学[M].北京:地质出版社,1987..
  • 4华解明.“大井法”预测矿井涌水量问题探讨[J].中国煤炭地质,2009,21(6):45-47. 被引量:89

二级参考文献2

  • 1房佩贤,等.专门水文地质学[M].武汉:长春地质学院,1985.
  • 2供水水文地质手册(第二册水文地质计算)[M].北京:地质出版社,1990.

共引文献144

同被引文献139

引证文献18

二级引证文献58

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部