期刊文献+

工时定额管理方法探索与制定 被引量:5

Exploration and Development of Labor Time Quota Management Method
下载PDF
导出
摘要 市场和顾客的需求越来越个性化、多样化,社会劳动力资源越来越紧缺,在现有生产条件下如何获得高质量、低成本且能快速适应市场的产品,是机械加工企业追求的目标。恒安公司经过深入研究与探索,制定了适用于离散型机械加工企业的生产工时定额管理方法,制定了作业基准工时,使用了"五项工时、三个系数",合理的核算出了离散性机械加工企业生产车间劳动工时定额。为离散型机械加工企业的生产工时定额偿试探索出了一条新的且可广泛推广的管理思路。 The demand from markets and customers is more and more personalized and diversified. Social labor resources are scarce.How to make products with high quality and low cost to meet the demand from markets quickly is the aim of machining factories. After an in-depth research and exploration, HENGAN has developed a method of the Labor time quota management, which can be applied in the discrete manufacturing enterprises. HENGAN has set up a standard working time and calculated the reasonable Labor time quota in its workshops by "5 items of time quote and 3 coefficients". It helps to bring a new and widely promoted management idea to the discrete manufacturing enterprises to explore the time quota.
出处 《现代制造技术与装备》 2015年第1期61-64,共4页 Modern Manufacturing Technology and Equipment
关键词 工时定额 作业基准工时 物料定额 labor time quota standard working time material quota
  • 相关文献

参考文献4

二级参考文献11

  • 1王强,石晶玉.多元非线性回归建模法在工业生产管理中的应用[J].管理工程学报,1995,9(2):139-142. 被引量:3
  • 2王强,机械工程学报,1993年,4期
  • 3戴同.CAD/CAPP/CAM基础教程[M].北京:机械工业出版社,1997..
  • 4BOOTHROYD G, DEWHURST P, KNIGHT W. Product design for manufacture and assembly[M]. NY: Marcel Dekker, 1994.
  • 5G·曼格斯 P·默兰.塑料注射成型模具的设计与制造[M].北京:中国轻工业出版社,1993..
  • 6WANG C, WANG D. The single machine ready time scheduling problem with fuzzy processing times[J]. Fuzzy Sets and Systems, 2002,127(2): 117- 129.
  • 7HU W, POLI C. To injection mould, to stamp, or to assemble? a DFM cost perspective[J]. Journal of Mechanical Design, 1999,121:461-471.
  • 8PIEGL L, TILLER W. Algorithm for finding all nearest neighbors[J]. Computer- Aided Design, 2002,34 (2): 167 -172.
  • 9WANG Q. Using genetic algorithms to optimize model parameters [J]. Environmental Modeling and Software with Environment Data News, 1997,12(1) :27-34.
  • 10李淑娟,李言,洪伟.基于神经网络的加工时间定额确定方法[J].机械科学与技术,2000,19(2):266-268. 被引量:27

共引文献29

同被引文献10

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部