任楼煤矿综采工作面歪架原因分析及防范对策

Analysis and Prevention Measures for Support Inclining in Fully Mechanized Working Face of Renlou Coal Mine
下载PDF
导出
摘要 针对任楼煤矿7240(上)南工作面回采过程中出现的机尾段歪架问题,从工作面矿压、工作面涌水影响和推进速度等角度,对歪架的原因进行了分析,并针对7240(上)南工作面的具体条件,提出了提高工作面支护质量、加强超前管理、减少甩采、合理排水等措施。 Aiming at the support inclining problem in southern of upper- 7240 working face in Renlou coal mine,the reason of support inclining was analyzed from the views of ground pressure, water inflow and mining velocity. And according to the specific conditions of upper- 7240 southern working face,prevention measures of supports inclining was proposed,including to improving working face support, enhancing pre- management, reducing turning mining, and using reasonable water drainage measures.
作者 王健
出处 《煤炭工程》 北大核心 2015年第3期65-67,共3页 Coal Engineering
关键词 推进速度 歪架 周期来压 甩采 支架下沉 advance rate support inclining periodic weighting turning mining support sink
  • 相关文献

参考文献9

二级参考文献8

共引文献112

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部