基于FMECA的钻孔灌注桩施工风险研究 被引量:1

Construction Risk Research on Bored Piles Based on the FMECA
下载PDF
导出
摘要 FMECA方法具有数据简单、处理直接、应用潜力大等优点,故将其引入到施工风险管理中。本文选取钻孔灌注桩为例分析建筑施工风险,采用FMECA中的风险优先数方法,将风险衡量因子扩展为"发生概率"、"危害程度"和"可检测度"三个因子,对钻孔灌注桩施工风险进行半定量分析,提出更客观的防治措施,进而验证了FMECA方法在施工风险分析中的有效性。 The FMECA method has the advantages of simple data, direct processing and great application potential, so it will be introduced to the construction risk management. Here, construction risk is analyzed by taking a bored pile as an example, and using risk priority number method of FMECA, the risk measure factor is expanded to three factors(occurrence probability, damage degree and detectability). Meanwhile, semi-quantitative analysis of construction risk of bored piles is took, more objective measures are put forward, and then verify the effectiveness of FMECA method in the construction risk analysis.
作者 白冰 李平
出处 《混凝土与水泥制品》 2015年第4期79-82,共4页 China Concrete and Cement Products
基金 河南省科技厅研究项目(编号:132400410185)
关键词 FMECA 钻孔灌注桩 风险管理 风险优先数 FMECA Bored piles Risk management Risk priority number
  • 相关文献

参考文献10

二级参考文献52

共引文献123

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部