摘要 在满足安全运行的基础上,以动力费用、热力费用及清管费用的总和为目标函数,建立了含蜡原油管道安全经济清管周期模型。基于中宁—银川输油管道清管后的运行数据,分析了不同进站温度、输量和余蜡厚度对管道安全经济清管周期的影响,结果表明:进站温度的升高会使管道运行日平均费用增加和清管周期延长,输量的增加会使管道运行日平均费用降低和清管周期缩短;进站温度为16、18℃时预留的余蜡厚度为0.4~0.6 mm,进站温度为14℃时可以不预留余蜡厚度;不同进站温度及输量下余蜡厚度对清管周期的影响规律基本一致,即清管周期均是随着余蜡厚度的增加而逐渐缩短,且进站温度改变时余蜡厚度对清管周期影响的变化较显著。 With safe operations ensured,taking the sum of power,thermal and pigging costs as the objective function,a safe and economic pigging frequency model for waxy crude oil pipelines was developed. Based on the operation data of Zhongning-Yinchuan pipeline upon being pigged,the influence of inlet temperature,throughput and remnant wax thicknesses on the safe and economic pigging frequency were analyzed. The results show that the average daily costs of pipeline operation will increase while the pigging frequency will be extended with the inlet temperature increasing; and conversely,the average daily costs of pipeline operation will decrease while the pigging frequency will be shortened with the throughput rising. The reserved remnant wax thickness is 0. 4 to 0. 6 mm when the inlet temperature is 16 or 18℃; but it is not necessary when the inlet temperature is 14℃. The influencing patterns of remnant wax thickness on pigging frequency at different inlet temperatures and throughputs are basically the same,i. e. the increase of remnant wax thickness can shorten the pigging frequency. In addition,the influence of remnant wax thickness on pigging frequency is more significant when the inlet temperature changes.
出处 《中国海上油气》 CAS CSCD 北大核心 2015年第2期120-126,共7页 China Offshore Oil and Gas
基金 国家自然科学基金面上项目"稠油流动边界层在水基泡沫作用下的阻力特性研究(编号:51074136)"部分研究成果
关键词 含蜡原油管道 清管周期 安全经济 计算模型 影响因素 waxy crude oil pipeline pigging frequency safe and economic computational model influencing factor
  • 相关文献

参考文献21

  • 1TORDAL A. Pigging of pipelines with high wax content[C]. Stavanger:Pigging Products and Services Association, 2006 1-6.
  • 2RONINGGEN H P. Production of waxy oils on the Norwe- gian continental shelf: experiences, challenges, and practices [J]. Energy Fuels,2012,26(7) :4124-4136.
  • 3WANG Q,SARICA C, VOLK M. An experimental study on wax removal in pipes with oil flow[J]. Journal of Energy Re- sources Technology, 2008,130 (4) : 43001-43005.
  • 4丁俊刚,蔡亮,王静,杨雪.中国与俄罗斯管道清管技术标准差异分析[J].油气储运,2013,32(9):1018-1021. 被引量:18
  • 5BANSAL R,BURLA R, AFZAL K, et al. Dynamic simulation for optimising pigging frequency for dewaxing[C]. SPE 153985,2012.
  • 6江国业,张文信,周诗岽,吴明,王平,田艺兵,王红霞,邵英武.低输量输油管道的清蜡周期研究[J].抚顺石油学院学报,2003,23(3):46-49. 被引量:11
  • 7孟令德.含蜡原油管道结蜡规律与清管周期确定[D].大庆:东北石油大学.2012.
  • 8姜海斌,袁运栋,屈文理,蔡丽君.库鄯输油管道清管周期的确定及经济分析[J].油气储运,2002,21(3):44-48. 被引量:7
  • 9张长勇.理论清蜡周期的推导[J].油气储运,1987,6(6):11-13.
  • 10王剑剑,李勇.鲁宁输油管道经济清管周期的确定[J].管道技术与设备,2004(4):39-40. 被引量:2

二级参考文献77

共引文献170

同被引文献69

引证文献8

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部