摘要 基于检修计划的水电站群联合调峰优化问题,在优化调峰效益时充分考虑电网的实际水电负荷需求,以负荷爬坡阈值平抑锯齿,得到平稳的水电调峰系数曲线;同时,考虑机组额定容量、预想出力、可用台数等限制,构建了完整的水电站群中期联合优化调峰效益最大模型。该模型求解采用DDDP-DPSA混合算法,通过优化—检验—调整—再优化的循环模式对线路和机组的检修计划进行校验和调整,最终获得水电站群中期联合调峰优化方案。 Joint peak regulation optimization scheme of hydropower station group based maintenance plan is rarely in common research.The actual load demand of hydropower on power grid is taken into full consideration in this paper.The peak coefficient curve of hydropower is smoothed by the climbing threshold of load.Meanwhile,the unit rated capacity,expected output and limiting the number of available units are used to build a medium-term joint peak regulation optimization model,which maximizes the benefit of peak regulation.DDDP-DPSA is adopted to solve this model.The maintenance plan of power lines and generator set is corrected by a circulation scheme of Optimization-Check-Adjust-Re-Optimization on dispatching.Eventually,the medium-term joint peak regulation optimization scheme of hydropower station group is acquired.
出处 《水电能源科学》 北大核心 2015年第4期52-55,共4页 Water Resources and Power
关键词 水电站群联合优化调度 调峰效益 负荷需求 爬坡阀值 检修计划 DDDP-DPSA joint optimization scheme of hydropower station group benefit of peak regulation load demand climbing threshold of load maintenance plan DDDP-DPSA
  • 相关文献

参考文献7

二级参考文献40

  • 1邓瑞鹏,周良栋,丁坚勇.发电设备的检修策略及可靠性管理研究[J].电力建设,2002,23(5):9-11. 被引量:3
  • 2汪哲荪,金菊良,魏一鸣,周玉良,杨希凡.基于自助法的中国水电能资源开发利用Logistic预测[J].水电能源科学,2010,28(10):151-153. 被引量:7
  • 3滕志楠,孙美斋.论龙、刘两库联合调度与西北电网多发水电[J].科技导报,1996,14(2):31-33. 被引量:1
  • 4GAO Huimin, WANG Chao. An optimal operation scheduling method of pumped storage station and thermal power station coordination [ C]// Proceedings of IEEE Power Systems Conference & Exposition, October 29-November 1, 2006, Atlanta, USA: 1829-1832.
  • 5徐珍懋.要重视混合式抽水蓄能电站的开发和改造[c]//中国水力发电工程学会1998年抽水蓄能专业委员会学术年会论文集,1998年11月,杭州:4-8.
  • 6Smith Athonym. Reliability-Centered maintenance. Newyork:McGaw-Hill, Inc, 1993.
  • 7周成 杨京燕 马昕.基于RCM的太平哨发电厂主接线设备检修管理的研究[C]..全国高等学校电力系统及其自动化专业第十八届学术年会论文集[C].,2002..
  • 8Endrenyi J, Aboresheid S,et al. The present status of maintenance strategies and the impact of maintenance on reliability[J].IEEE Transactions on Power Systems,2001,16(4): 638 -646.
  • 9Dubi A. Analytic approach & Monte Carlo methods for realistic systems analysis[J]. Mathematics and Computers in Simulation, 1998,47:243-269.
  • 10Borgonovo E, Marseguerra M,Zio E A. Monte Carlo Methodological approach to plant availability modeling with maintenance,aging and obsolescence[J]. Reliability Engineering and System Safety, 2000, 67:61-73.

共引文献76