期刊文献+

快速制作大中型水库洪水风险图方法研究 被引量:1

Research on Quick Mapping of Flood Inundated Areas for Large and Medium Reservoirs
下载PDF
导出
摘要 针对大中型水库洪水风险图制作速度慢的情况,运用水文学与水力学相结合的方法,使用MIKE11软件推算河道洪水水面线,利用谷地地理信息系统(Goody GIS)软件提取地面高程数据,最后在Arc GIS中结合水面线与DEM高程数据快速绘制洪水风险图,并利用水力学法对该方法效果进行评价。以大连市卧龙水库为例,快速绘制水库各频率洪水风险图,该方法制作速度快、精度也能很好的满足防洪减灾的目的,为管理者快速制定决策,为灾民迅速转移提供技术依据。 Regarding to the slow mapping of flood inundated areas for large and medium reservoirs,the method combining hydrology and hydraulics means was developed. Firstly,the water surface line was calculated by adopting MIKE11. Secondly,Goody GIS was utilized to extract ground elevation data,and then the flood inundated areas were quickly mapped in Arc GIS combining the data of the water line and elevation obtained from the 2 softwares mentioned above. Finally,the calculation results were checked by hydraulic method. This new method was verified by the mapping of Dalian Wolong Reservoir,in which the flood inundated areas of different frequency were developed. This method possesses the merits of high speed and precision which would meet the requirement of flood control and disaster mitigation. And it will provide the scientific basis for the authorities to make decisions quickly and for the people who live in the flood inundated areas to relocate rapidly.
出处 《水利与建筑工程学报》 2015年第2期86-89,115,共5页 Journal of Water Resources and Architectural Engineering
关键词 ARCGIS 数字高程模型 快速制作 洪水淹没图 ArcGIS DEM quickly mapping the map of flood inundated areas
  • 相关文献

参考文献15

二级参考文献41

共引文献105

同被引文献18

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部