摘要 为了分析城市土地利用对道路的交通影响,需要准确地分析城市建筑物出口与道路连接处的通行能力。对建筑物出口车流插入的实际交通运行特征进行了深入分析,在参照主路优先的无信号交叉口的可插入间隙理论模型基础上,通过实际调查数据对模型的车辆长度、安全间距、加速度和主路可接受间隙等关键参数进行分类量化修正和标定,解决了原模型难于反应建筑出口可容纳排队车辆数及主路车流速度对建筑物出口可插入车流能力的影响的问题,能有效得出不同等级城市道路的建筑物出口所能承受的插入车流量。新的模型与实际交通情况具有更高的拟合度,为准确评估地块开发后对所在道路的交通影响提供了量化参考,提高了城市规划的科学性。 In order to carry out traffic impact analysis in a more scientific manner,the capacity of the intersections between land use units and roads need to be carefully studied.The operating characteristics of merging traffic from land use units are analyzed.Based on the acceptable gap theory,which has been widely used to examined the capacity of unsignalized T-intersections,the model parameters,such as vehicle length,safe gap,acceleration and acceptable gap on the main road,are estimated and calibrated on the basis of actual survey data.The model developed accounts for the impact of the queuing capacity at the exit of land use units and the traffic speed on the main road to the merging traffic and therefore can be used to estimate the maximum merging volumes of urban roads from different functional classes.The model proposed here can better simulate real-world traffic behavior and can provide a better quantitative analysis tool of traffic impact of land development.
作者 熊文华 林思
出处 《交通信息与安全》 2015年第1期60-65,共6页 Journal of Transport Information and Safety
关键词 交通规划 道路通行能力 可接受间隙 建筑物出口 城市道路 transport planning road capacity acceptable gap exit of land use units urban road
  • 相关文献

参考文献7

  • 1Transportation Research Board of the National A- cademies. Highway capacity manual[M]. Washing- ton. DC,Transportation Research Board,2010.
  • 2Aty Mohamed A,Roundabouts design, modeling and simulation[R]. Florida:Department of Civil and En-vironmental Engineering. University of Central Florida, 2001.
  • 3Rouphail N, Tarko A, Jing L. Traffic flow theory. Part 9:Traffic Flow at Signalized Intersections[M]. Federal : Federal Highway Administration, 2011.
  • 4Hagring O. Derivation of a capacity equation for a roundabout entry with mixed circulating and exiting flow[R] Washington. DC: Transportation Research Board, 2001 : 91-99.
  • 5郑柯,张起森.无信号交叉口可接受间隙理论模型修正分析[J].长沙交通学院学报,2001,17(1):36-38. 被引量:10
  • 6张兰芳,方守恩.公路平面交叉口合理间距研究[J].重庆交通大学学报(自然科学版),2008,27(2):276-278. 被引量:15
  • 7曹晓奎,裴玉龙,李龙,耿艳妍.停车场出入口布置相关问题研究[J].城市交通,2010,8(2):61-65. 被引量:12

二级参考文献15

  • 1周同吾.交通工程[M].上海:同济大学出版社,1987..
  • 2Precast/Prestressed Concrete Parking Structures:Recommended Practice for Design and Construction[EB/OL].199712009-05-01].http://www.pci.org/pdf/publications/parking/P_MNL-129-98.pdf.
  • 3[2]JTG B 01-2003,公路工程技术标准[S].
  • 4[2]JTG/TB-2004,公路项目安全性评价指南[S].
  • 5[3]Williams W L.Driveway behavior during the yellow time interval[C]//TRB Record 644.Washington D.C.:Tran-sportation Research Board,1977.
  • 6[4]Chang M S,Messer C J,Santigo J.Timing traffic signal change intervals based on driver behavior[C]// Washington D.C.:Transportation Research Record,1995.
  • 7[5]日本道路協会.道路構造令の解説と運用[M].東京:丸善株式会社出版事業部,2004.
  • 8JGJ100-98.汽车库建筑设计规范[S].[S].,..
  • 9CJJ37-90.城市道路设计规范[S].[S].,..
  • 10熊娟,陈峻,张辉.城市路外停车场出入口接驳处交通调查分析[J].交通科技与经济,2007,9(6):75-77. 被引量:9

共引文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部