期刊文献+

部分逆作结合中心岛开挖方式的超大深基坑围护与施工 被引量:2

Partial Top-Down Construction Method Combined with Center Island Excavation Method for Super Large Deep Foundation Pit Excavation Support Construction
下载PDF
导出
摘要 通过对佛山市东平广场项目地质条件、周围环境、开发要求等综合分析,并结合工程施工的特点、难点,采用部分全逆作结合中心岛的围护设计与施工方法,取得了较好的效果。该围护形式及在分期开发的超大深基坑中的应用经验,可为今后类似工程的设计与施工提供借鉴。 Based on the comprehensive analysis of Foshan Dongping Plaza, such as the geological conditions, the surrounding environment, the development requirements, combined with the specialties and difficulties in construction, the partial top-down construction method combined with the center island excavation support design and construction method have been used for the project, which achieved better results. Such support type and the application experience in large deep foundation pit construction by phased development can provide references for similar design and construction project.
作者 李晓青
出处 《建筑施工》 2015年第4期444-446,共3页 Building Construction
关键词 超大深基坑 部分逆作 中心岛开挖 围护设计 super large deep foundation pit partial top-down construction center island excavation excavation support design
  • 相关文献

参考文献6

二级参考文献9

共引文献27

同被引文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部