乌东德水电站是长江干流的特大水电站工程,关乎工程度汛安全。其右岸导流洞工期异常紧张,经过研究并结合现场试验,施工全部采用堆石混凝土浇筑,最终大大地缩短了工期,节约了成本,堆石混凝土的浇筑效果完全满足设计要求。
Wudongde Hydropower Project is a super large one on the main stream of the Yangtze River.Its safety during the flood season is very crucial.The construction period of the diversion tunnel on right bank is very short.Through careful study and in combination of site test, the cofferdam is completely built with rockfill concrete, which largely shortens the construction period and reduce the cost.The placement of the rockfill concrete fully satisfied design requirements.
出处
《西北水电》
2015年第2期56-59,共4页
Northwest Hydropower
关键词
堆石
混凝土
导流围堰
乌东德水电站
rockfill
concrete
river diversion cofferdam
Wudongde Hydropower Project