新田选煤厂工艺总平面优化设计

Optimal design for technology of general plan of at Xintian Coal Preparation Plant
下载PDF
导出
摘要 以工艺总平面布置与自然地形的协调统一性为设计理念,以黔西新田煤矿选煤厂工艺总平面布置为实例,结合工艺流程及现场地形地貌将厂区按特征分为三级区域台阶,并重点对两种较典型的工艺布置设计方案进行对比,确保新田选煤厂的工艺布置更具合理性、经济性和实用性。 Taking the coordinate integration of general plan of process arrangement and natural topography as the design concept, and the general plan arrangement of Qianxi Xintian coal preparation plant as an example, referring technical flowsheet and general configuration and topography of the plant area,three classes of terraces defined,two typical design options of process arrangement compared,ensuring the process arrangement of Xintian coal preparation plant being rather reasonable,economic and practical.
出处 《煤炭加工与综合利用》 CAS 2015年第3期22-25,30,共4页 Coal Processing & Comprehensive Utilization
关键词 选煤厂 工艺 总平面布置 竖向设计 优化 coal preparation plant technical process general plan arrangement vertical design optimization
  • 相关文献

参考文献4

二级参考文献5

  • 1王时芬.厂区地形与总图设计之探讨[J].有色金属设计,2005,32(4):62-65. 被引量:13
  • 2GB 50215-2005,煤炭工业矿井设计规范[S].
  • 3李善;傅达聪.煤炭工业企业总平面设计手册[M],1990.
  • 4雷明.工业企业总平面设计[M]西安:陕西科学技术出版社,1998.
  • 5徐永圻.煤矿开采学[M]徐州:中国矿业大学出版社,1999.

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部