海外EPC项目设计差异分析与对策探讨 被引量:5

Differential Analysis Countermeasure Discussion on Overseas EPC Projects Design
下载PDF
导出
摘要 参与海外EPC项目设计需要制定技术先进、经济合理并具有很强竞争力的方案,应针对设计过程中遇到的技术、管理差异采取有效的针对性对策,加强与施工、采购的密切配合,提高产品质量、保证工程进度,为总包商、业主提供更加全面、优质的服务。海外EPC项目设计顺利开展,对整个EPC工程进展起着决定性的作用。文章以委内瑞拉铁路项目为例,针对海外EPC项目设计过程中主要环节,进行差异分析,探讨对策以确保海外EPC项目设计顺利开展。海外项目可能面临诸多不确定因素的影响,如政治、经济、文化差异、语言沟通等给予充分考虑,应制定切实可行的实施方案,将项目承担风险降到最低。 The overseas EPC projects design requires making technically advanced, economically reasonable and compet-itive scheme, adopting effective and targeted countermeasures, strengthening the close coordination with construction and procurement, increasing products quality, ensuring project schedule, more entirely and better serving the contractor and owner. The fluent implementation of overseas EPC projects design is very crucial for the progress of entire EPC project. Taking Venezuela railway as an example, aiming at the main procedures of overseas EPC projects design process, differ-ences are analyzed, countermeasures ensuring the fluent implementation of overseas EPC projects are discussed in the paper . The feasible and implementation scheme should be made to minimize the project risks by taking full consideration of possible influences of many uncertain factors such as politics, economy, culture difference and language, etc.
作者 熊力
出处 《高速铁路技术》 2015年第2期97-100,共4页 High Speed Railway Technology
关键词 海外EPC项目 规范标准 工程设计 差异 对策 overseas EPC projects standards and criterias project design difference countermeasures
  • 相关文献

参考文献6

二级参考文献6

  • 1何伯森主编.国际工程合同与合同管理[M].,..
  • 2中国企业国际化管理课题组.企业人力资源国际化管理方法[M].,..
  • 3梁槛.菲迪克合同条件及施工合同管理[J]..
  • 4梁槛.菲迪克合同条件及施工合同管理[J]..
  • 5中国铁建投资沙特轻轨亏损41亿元.中国证券报.
  • 6徐沛宇.缘起风险防范?中铁波兰高速公路项目被迫终止.第一财务日报.

共引文献198

同被引文献44

引证文献5

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部