注浆加固技术在过陷落柱时的研究与应用 被引量:3

Research and Application of Technology at the time of grouting Collapsed
下载PDF
导出
摘要 陷落柱是煤矿建设和生产中经常遇到的地质因素之一,通过研究陷落柱的构造特性,根据具体工程的实际情况,运用理论分析计算和数值模拟手段,对比论证,确定陷落柱加固的处理部位与范围以及工作面通过陷落柱的工程措施,经工程验证,现已安全通过。 The collapse column is one of the geological factors affecting coal mine production and eonstruetion, by studying the characteristics of the structure of the collapsing column and mechanical mechanism of the influence on the roof and floor, according to the actual eireum stance of working face, through the theoretical analysis and calculation, numerical simulation methods, multiple comparison, to determine the collapse column reinforcement processing parts and scope as well as the working face through engineering measures of collapse column, it has been verified by engineering, safer now. |
作者 丁景明
出处 《煤矿现代化》 2015年第3期44-46,共3页 Coal Mine Modernization
关键词 陷落柱 理论分析 数值模拟 开采技术 Subsided column The theoretical analysis The numerical simulation Production technique
  • 相关文献

参考文献5

二级参考文献33

共引文献248

同被引文献4

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部