期刊文献+

基于异步时间段的连续时间原油混输调度模型 被引量:7

AN ASYNCHRONOUS TIME SLOT-BASED CONTINUOUS TIME FORMULATION FOR SCHEDULING CRUDE OIL OPERATIONS
下载PDF
导出
摘要 原油混输调度是炼油厂调度的源头,对生产起重要作用。针对由油轮、泊位、码头罐、管线、厂区罐和蒸馏装置组成的原油混输系统,考虑码头罐单储、蒸馏装置进料质量要求等实际操作因素,建立基于异步时间段表征的原油混输调度模型。以国内某典型沿海炼油厂为例,对模型求解方案的可行性和求解效率进行验证。结果表明,虽然模型规模较大,但模型能在较短求解时间内获得全局最优解,相应调度方案中码头罐和厂区罐收付油操作合理,充分缩短了滞船期和卸油时间,可保证蒸馏装置平稳运行,实现卡边操作。所建原油混输模型具有较好的工业应用价值。 Scheduling of crude oil operations is the first step of the refinery operations, which decides the subsequence process management. Based on the information of vessels, berths, terminal storage tanks, pipelines, factory tanks and crude distillation units of the refinery system and the consid- eration of the actual operation, like terminal tanks of single store, the feed quality requirements for the distillation units, et al, a blended crude transportation scheduling model was established based on asynchronous time characterization. Taking a typical domestic coastal oil refinery as an example, the feasibility of the model and solution efficiency was validated. The proposed model can obtain the optimal scheme in a short time despite the large scale of the model, which ensures the reasonable operations of terminal storage tanks, pipelines, factory tanks, fully shorten the delay shipping date and unloading time, and satisfies the requirements for smooth running of the crude distillation units, and realizes criti- cal operation. The practical values of this scheduling model are worthy of being appreciated.
出处 《石油炼制与化工》 CAS CSCD 北大核心 2015年第6期95-100,共6页 Petroleum Processing and Petrochemicals
关键词 原油混输调度 模型 连续时间 异步时间段 crude oil scheduling model continuous time asynchronous time slots
  • 相关文献

参考文献14

  • 1Shah N. Mathematical programming techniques for crude oil scheduling[J]. Computers Chemical Engineering, 1996, 20, Supplement 20 : S1227-S1232.
  • 2Reddy P C P, Karimi I A, Srinivasan R. Novel solution ap- proach for optimizing crude oil operations[J]. AIChE Jour- nal,2004,50(6) : 1177-1197.
  • 3Lee H,Pinto J M,Grossmann I E, et ai. Mixed-integer linear programming model for refinery short-term scheduling of crude oil unloading with inventory management[J]. Industrial Engineering Chemistry Research, 1996,35 (5) : 1630-1641.
  • 4Li Wenkai,Hui Chiwai, Ben Hua, et al. Scheduling crude oil unloading, storage, and processing[J]. Industrial y- Engineer- ing Chemistry Research, 2002,41 (26) .. 6723-6734.
  • 5Chen Xuan,Grossmann I, Li Zheng. A comparative study of continuous-time models for scheduling of crude oil operations in inland refineries[J]. Computers Chemical Engineering, 2012,44:141-167.
  • 6Jia Zhenya, Ierapetritou M, Kelly J D. Refinery short-term scheduling using continuous time Sormulation: Crude-oil oper- ations[J]. Industrial - Engineering Chemistry Research, 2003,42(13): 3085-3097.
  • 7Reddy P C P, Karimi I A, Srinivasan R. A new continuous time formulation for scheduling crude oil operations [J]. Chemical Engineering Science, 2004,59(6) : 1325-1341.
  • 8Li Jie, Misener R, Floudas C A. Continuous-time modeling and global optimization approach for scheduling of crude oil operations[J]. AIChE Journal, 2012,58(1) : 205-226.
  • 9Shah N K, Ierapetritou M G. Short-term scheduling of a large-scale oil-refinery operations Incorporating logistics de- tails[J]. AIChE Journal,2011,57(6) : 1570-1584.
  • 10Pan Ming, Li Xiuxi, Yu Qian, New approach for scheduling crude oil operations[J]. Chemical Engineering Science, 2009, 64(5) : 965-983.

二级参考文献2

共引文献9

同被引文献35

  • 1Ming Pan, Yu Qian,XiuXi Li.Flexible scheduling model of crude oil operations under crude supply disturbance[J].Science China Chemistry,2009,52(3):387-400. 被引量:4
  • 2周祥,郭锦标,周涵,单石灵,梁彬华.约束规划方法在原油混输调度中的应用[J].计算机与应用化学,2008,25(1):51-53. 被引量:7
  • 3Shah N. Mathematical programming techniques for crude oil scheduling[J].Computers &Chemical Engineering, 1996,20 (S) :1227 -1232.
  • 4Lee H, Pinto J M, Grossmann I E, et al. Mix-integer linear programming model for refinery short-term scheduling of crude oil unloading with inventory management[J]. Industrial& Engineering Chemistry Research,1996,35(5):1630 -1641.
  • 5Jia Z,Ierapetritou M G,Kelly J D. Refinery short term sched- uling using continuous time formulation:Crude oil operations[J].Industrial & Engineering Chemistry Research, 2003,42 (13) :3085-3097.
  • 6Li Wenkai, Hui Chiwai, Hua Ben, et al. Scheduling crude oil unloading, storage, and processing[J].Industrial & Engineer ing Chemistry Research. 2002,41(26) :6723- 6734.
  • 7Reddy P C P, Karimi I A, Srinivasan R. Novel solution ap proach for optimizing crude oil operations[J]. AIChE Jour nal,2004,50(6) :1177 -1197.
  • 8Meyer C A, Floudas C A. Global optimization of a combinato- rially complex generalized pooling problem[J]. AIChE Jour nal,2006,52(3) :1027- 1037.
  • 9Karuppiah R, Grossmann I E. Global optimization for the synthesis of integrated water systems in chemical processes [J]. Computers &Chemical Engineering. 2006,30(4):650- 673.
  • 10周祥,郭锦标,周涵,梁彬华.原油混输调度的模型法研究[J].石油炼制与化工,2008,39(1):49-52. 被引量:4

引证文献7

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部