摘要 有黏结后张预应力钻孔灌注桩技术是针对沿海地区环境,解决建筑物上浮的抗拔桩问题。当前,抗拔桩设计一般采用普通钻孔灌注桩或预制混凝土桩,普通钻孔灌注桩作为抗拔桩,配筋率高、安全性和耐久性低;预制混凝土桩造价高、工期长、安全性低。有黏结后张预应力钻孔灌注桩技术实现了在原来普通钻孔灌注桩中加入高强预应力钢筋的工艺,形成了一整套后张预应力钻孔灌注桩施工方法,实现了桩体下端锚固,降低了抗拔的普通钻孔灌注桩配筋率,解决了一般抗拔桩安全性低的实际问题,提高地下结构的裂缝控制等级和结构的耐久性。通过有黏结后张预应力施工工艺的实施,保证了预应力筋、普通钢筋和混凝土的协同工作。 The technique of post-tensioned prestressed bored cast-in-situ pile is due to the coastal environments and it was aimed to solve the rising problem of uplift pile. Engineers often use bored piles and precast concrete piles when encountering these situations. Considering of the up-lift piles,normal designation are most has a high ratio of reinforcement and a low ratio of safety and durability,another problem is the high cost and long time limit of the project. Based on techniques of common concrete bored piles,post-tensioned prestressed bored cast-in-situ pile was used by adding the high strength prestressed steel bars. It was eventually developed a whole construction method with the anchorage of pile of bottom and low ratio of steel bars of common concrete bored piles. And the problems of common uplift pile safety,the higher level of underground crack control and the durability of structure were also solved.The coordination of pre-stressed steel bars,common steel bars and the concrete was also guaranteed.
出处 《施工技术》 CAS 北大核心 2015年第9期98-101,共4页 Construction Technology
关键词 桩基础 钻孔灌注桩 预应力 裂缝 施工技术 piles bored piles prestressing cracks construction
  • 相关文献

参考文献6

  • 1中国建筑科学研究院.JGJ94-2008建筑桩基技术规范[S].北京:中国建筑工业出版社,2008.
  • 2中国建筑科学研究院.GB50010-2010混凝土结构设计规范[s].北京:中国建筑工业出版社,2010.
  • 3天津市地质工程勘察院.KC2013F337天津市建筑工程质量检测中心(厂房、办公楼及附属设施)项目勘察报告[R].2013.
  • 4中国建筑科学研究院.JGJ106-2003建筑基桩检测技术规范[S].北京:中国建筑工业出版社,2003.
  • 5罗江波.地铁车站深大基坑工程开挖施工研究[J].山西建筑,2012,38(11):70-72. 被引量:6
  • 6孙钧.城市地下工程活动的环境土工学问题(下)[J].地下工程与隧道,2000(1):2-7. 被引量:40

二级参考文献7

  • 1余永祯.建筑施工手册[M].第4版.北京:中国建筑工业出版社.2003.
  • 2NORDMARK A.Access way to underground space;presend of access ways to underground space with examples of spatial re-quirements ITA Working Group4“subsurface planning”[J].Tunnelling and Underground Space Technology,2004,20(6):534-557.
  • 3HU ZF,YUE Z Q,ZHOU J,et al.Design and construction of a deep excavation in soft soils adjacent to the Shanghai metro tun-nels[J].Canadian Geotechnical Journal,2003,40(5):933-948.
  • 4ONO J,MURATA K.Construction of a very deep subway station using cut-and cover method under high groundwater pressure[A].//Proceedings of Congress on Tunnelling and Ground Conditions[C].Cairo:A.A.Balkema,1994:187-194.
  • 5Madhav M.R,Sharma J.S.N.Analysis of Deformation of Re-inforced Earthwalls[J].Proceedings of the tenth asian regional conference on soil mechantcsand foundation engineering,1995(15):23-25.
  • 6林刚,徐长节,蔡袁强.不平衡堆载作用下深基坑开挖支护结构性状研究[J].岩土力学,2010,31(8):2592-2598. 被引量:86
  • 7纪广强,董平,秦然,曹孝华.某深基坑开挖对周围环境影响的监测[J].水文地质工程地质,2002,29(5):29-32. 被引量:12

共引文献359

同被引文献33

引证文献8

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部