摘要 以南海某深水气田为研究目标,运用HYSYS软件对所提出的FLNG装置丙烷预冷双氮膨胀液化工艺流程的关键运行参数进行了优化分析,重点分析了进入液化单位的天然气入口温度、入口压力、组成和压缩机水冷器温度、丙烷节流后温度、氮气一级膨胀前后压力对整个液化工艺流程性能(包括系统能耗、制冷剂流量)的影响。研究认为需要从技术、经济和安全性等方面进行综合分析后才能合理确定进入液化单元天然气入口温度、入口压力和压缩机水冷器温度,合理确定一级氮气膨胀前后压力有助于降低系统功耗和氮气流量;根据丙烷自身的性质,丙烷预冷的温度设定在-35℃左右比较合理。 Taking a deep water gas field in the South China Sea as the research object, the key parameters for liquefaction process of propane pre-cooling and dual nitrogen expansion were analyzed with HYSYS software. Effects of inlet temperature, inlet pressure and component of natural gas into the liquefaction u- nit, compressor cooler temperature, propane temperature (upon throttling), and also nitrogen pressure before and after expansion machine, on the energy consumption and refrigerant flow of the whole process were analyzed particularly. Results show that it is essential to choose the reasonable natural gas inlet tem- perature and pressure into the liquefaction unit, as well as compressor cooler temperature upon fully con- sidering the technology, economy and safety aspects. Determining the right pressure before and after ni- trogen expansion machine can reduce energy consumption and nitrogen flow. It is reasonable to set the propane pre-cooling temperature at -35℃ or so.
出处 《中国海上油气》 CAS CSCD 北大核心 2015年第3期138-144,共7页 China Offshore Oil and Gas
基金 "十二五"国家科技重大专项"大型FLNG/FLPG FDPSO关键技术(编号:2011ZX05026-006)"部分研究成果
关键词 南海深水气田 FLNG 丙烷预冷 双氮膨胀 液化工艺流程 关键运行参数 deep water gas field, South China Sea FLNG propane pre-cooling dual nitrogen expansion liquefaction process key operating parameters
  • 相关文献

参考文献8

  • 1WIJINGAARDEN W V,MEEK H J.The generic LNG FPSO-A quick & cost-effective way to monetize stranded gas fields[M].Perth,Australia:Society of Petroleum Engineers,2008:655-666.
  • 2IVERSEN I,HELLEKLEIV V.LNG-FPSO-Solving the supply shortfall[C]. OTC 20102,2009.
  • 3GANIELSEN H K,ANDREASSEN G,VERITAS D N,et al.The commercial advantages and limitations:onshore versus offshore LNG import facilities[C].OTC 19551.2009.
  • 4PASTOOR W,LUND K,TVEITNES T,et al.The LNG producer:a generic design with great adaptability[C].OTC 19845,2009.
  • 5喻西崇,谢彬,邬亚玲,李玉星,王武昌,朱建鲁.大型FLNG/FLPG装置上部模块二氧化碳预冷双氮膨胀液化工艺方法[J].油气储运,2014,33(1):89-94. 被引量:14
  • 6朱刚,顾安忠.新型液化天然气浮式生产储卸装置[J].中国海上油气(工程),2000,12(6):1-4. 被引量:6
  • 7王保庆.天然气液化工艺技术比较分析[J].天然气工业,2009,29(1):111-113. 被引量:49
  • 8Lin Riyi,Yu Xichong.Exergy analysis for LNG refrigeration cycle[C].2011 International Conference on Computer Distributed Control and Intelligent Environmental Monitoring,2011:212-214.

二级参考文献10

共引文献62

同被引文献72

引证文献12

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部