核电1000MW半速发电机结构特点与安装关键技术 被引量:1

Structural Characteristics and Installation Key Technology of 1000MW Nuclear Half Speed Generator
下载PDF
导出
摘要 宁德核电站(CPR1000压水堆)一期工程发电机为核电1 000 MW半速发电机,是常规岛重要主机设备之一。对半速发电机的结构特点、安装关键技术进行了阐述,通过现场安装关键技术的实施及有效质量控制,发电机轴承的轴振、轴瓦振动速度指标均优良,保证了发电机的安装质量和机组的稳定运行。 The first phase of Ningde nuclear power station (CPR1000 pressurized water reactor) has a nuclear power half speed generator with a capacity of 1 000 MW.It is one of the most important main machines in conversional island.A detailed explanation is given to the structure feature and installation key technology of the generator.During the period of installation, advanced technology was adopted and effective quality control was carried out.As a result,speed index of shaft vibration and bearing vibration are up to standard,indicating high quality of the generator installation and ensuring steady operation of the unit.
出处 《山东电力技术》 2015年第5期33-37,共5页 Shandong Electric Power
关键词 核电半速发电机 结构特点 安装关键技术 nuclear power half speed generator structure feature installation key technology
  • 相关文献

参考文献7

二级参考文献12

  • 1徐绿野,张汉英.大型汽轮发电机组弹簧隔振基础探讨[J].发电设备,2005,19(2):69-72. 被引量:13
  • 2尹学军,王伟强,沙曾炘.核电站的半速汽轮发电机组与弹性基础[J].电力建设,2005,26(9):45-48. 被引量:14
  • 3东方汽轮机有限公司.汽机通用安装指导书[G].德阳:东方汽轮机有限公司,2010.
  • 4东方汽轮机有限公司.核电半转速汽机高中压模块[G]德阳:东方汽轮机有限公司,2010.
  • 5东方汽轮机有限公司.汽机低压模轴承箱安装指导书[G].德阳:东方汽轮机有限公司,2010.
  • 6DL/T52103-2009电力建设施工技术规范(汽轮发电机组)[S].北京:中国电力出版社,2012.
  • 7DL/T5210.3-2009电力建设施工质量验收及评价规程[S].北京:中国电力出版社,2009.
  • 8张永江.汽轮机设备安装[M].北京:中国电力出版社,2013.
  • 9中广核工程有限公司.宁德核电厂一期项目三维模型及技术报告[R].深圳:中广核工程有限公司,2010.
  • 10GB/T1800.2-2009产品几何技术规范(GPS)极限与配合[S].北京:中国标准出版社,2009.

共引文献20

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部