1[1]J.P. Birat. A futures study analysis of the technological evolution of the EAF by 2010. La Revue de Metallurgie-CTT,2000,(11) : 1347.
2[2]M. Hamy, F. Koller. Performance of UHP-EAF at Badische Stahwerke. Proceedings of the 6th European Electric Steelmaking Conference, 1999,29.
3[6]K. Bergman, R. Conzales, M. A. Pedroza et al. Twin electric DC EAF. Proceedings of the 6th European Electric steelmaking Conference, 1999,73.
4[7]L. Hart,M. Wieatner, C. Hillberg. SVCs for minimal flicher & higher production with DC furnaces. Steel Times International 2000,24(3) :22.
5[8]R. Schwing,M. Huck,K. Libera, et al. Alarc-PC, co-post-combustion. Proceedings of the 6th European Electric Steelmaking Conference, 1999,225.
6[10]P.C. Mathur. Coherent injection technology of Praxair.I&SM,1999, 26(3) :59.
7[11]R. Schwing, M. Harny. Maximizing EAF Productivity and lowering operating costs with Praxair's CoJet Coherent Technology Results at BSW. Proceedings of the 6th European Electric Steelmaking Conference, 1999,220.
8[12]G. Giteman, V. Shifrin, Apopenov et al. Optimization of auxiliary energy utilization in Modern EAF operation. Proceedings of the 6th European Electric Steelmaking Conference,1999,234.
9[13]G. Giteman. PYREJET-a multi-function combustion/injection system for EAF steelmaking. American Combustion 公司技术交流资料,1999.
10[14]M. Beirer. Operational results of a double shaft furnace at SAM Montereau. I&SM, 1995,22(5): 49.