期刊文献+

考虑多技能人员的装配线再平衡问题研究 被引量:6

Research on Assembly Line Rebalancing with Mixed-skill Workers
下载PDF
导出
摘要 装配线上高技能员工离岗,新员工不能直接替换上岗,将会导致装配线产能下降,甚至停产。为了保证装配线的正常运作,在充分考虑人力资源和空间等约束的前提下,建立了以最大化装配线产能和最小化人员成本为目标的装配线人员再分配模型,并设计了一种启发式算法进行求解。最后通过工程实例,验证了该方法的有效性。 The leaving high-skilled operators and the unqualified newoperators,make the assembly line decrease in production capacity,or even shut down. In this paper,the rebalancing problem concerns howto reassign assembly operators under the constraints of human resources and space,to make sure the assembly line operates normally. The objectives are to maximize the production of the assembly line and minimize the staff costs. A multi-objective heuristic algorithm is proposed to solve this problem. Eventually,the effectiveness of the proposed method is verified by an engineering project.
出处 《组合机床与自动化加工技术》 北大核心 2015年第7期131-134,共4页 Modular Machine Tool & Automatic Manufacturing Technique
基金 国家自然科学基金(51475303)
关键词 装配线 再平衡 人员再分配 多目标 启发式算法 assembly line rebalancing workers reassignment multi-objective heuristic method
  • 相关文献

参考文献4

二级参考文献38

  • 1李斌,陈立平,黄正东,肖人彬,钟毅芳.面向大规模定制的装配线优化调度研究[J].中国机械工程,2005,16(24):2198-2202. 被引量:14
  • 2BUZACOTT J A. The impact of worker differences on production system output[J]. International Journal of Production Economics, 2002, 78 (1): 37-44.
  • 3ALFARES H K. Survey, categorization, and comparison of recent tour scheduling literature [J]. Annals of Operations Research, 2004, 127 (1/4) : 145-175.
  • 4BEDDOE G R, PETROVIC S. Selecting and weighting features using a genetic algorithm in a case-based reasoning approach to personnel fostering [ J ]. European Journal of Operational Research, 2006, 175 (2): 649-671.
  • 5CEVIKCAN E, DURMUSOGLU M B, UNAL M E. A team-oriented design methodology for mixed model assembly systems [J]. Computers & Industrial Engineering, 2009, 56(2) : 576-599.
  • 6ERNST A T. Staff scheduling and rostering: a review of applications, methods and models[J]. European Journal of Operational Research, 2004, 153(1): 3-27.
  • 7RAGOTTE M J. The effect of human operator variability on the throughput of an AGV system. A case study: general motors car assembly plant - door AGV system [D]. Canada: University of Waterloo, 1990.
  • 8SABAR M B, MONTREUIL M F. Competency and preference based personnel scheduling in large assembly lines [J]. International Journal of Computer Integrated Manufacturing, 2008, 21(4): 468- 479.
  • 9COROMINAS A R, PASTOR J P. Balancing assembly line with skilled and unskilled workers[J]. Omega, 2008, 36(6): 1126-1132.
  • 10NAKADE K, NISHIWAKI R. Optimal allocation of heterogeneous workers in a U-shaped production line [J]. Computers & Industrial Engineering, 2008, 54 (3) : 432-440.

共引文献25

同被引文献29

引证文献6

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部