摘要
既有内燃铁路由于建设年代较早,受当时技术经济条件限制,环境保护标准较低,铁路沿线的规划控制也没有得到足够重视,后续电气化改造工程无法完全克服这些不足,为其环境保护验收留下了客观困难。此外,电气化改造工程的环境保护验收与环境影响评价在时序上大多相隔时间较远,为环保验收增加了一定困扰。通过分析既有铁路电气化改造工程在环境保护验收中存在的主要问题,提出了相关对策建议。
Diesel railways were built in old days when due to restricted technical and economic conditions, the adopted environmental protection standards were low and environmental planning along the railways was not given enough attention. These problems can not be solved by subsequent electrification engineering, posing difficulties in its environmental check and approval upon completion. In addition, the interval between environmental check and EIA is usually so long, that it makes the environmental check more difficult. The paper analyzed the main problems encountered during environment check and approval of railway electrification engineering and raised several suggestions.
出处
《环境影响评价》
2015年第4期51-53,共3页
Environmental Impact Assessment
关键词
既有铁路
电气化改造
环保验收
existing railways
electrification
environmental check and approval upon project completion