摘要 既有内燃铁路由于建设年代较早,受当时技术经济条件限制,环境保护标准较低,铁路沿线的规划控制也没有得到足够重视,后续电气化改造工程无法完全克服这些不足,为其环境保护验收留下了客观困难。此外,电气化改造工程的环境保护验收与环境影响评价在时序上大多相隔时间较远,为环保验收增加了一定困扰。通过分析既有铁路电气化改造工程在环境保护验收中存在的主要问题,提出了相关对策建议。 Diesel railways were built in old days when due to restricted technical and economic conditions, the adopted environmental protection standards were low and environmental planning along the railways was not given enough attention. These problems can not be solved by subsequent electrification engineering, posing difficulties in its environmental check and approval upon completion. In addition, the interval between environmental check and EIA is usually so long, that it makes the environmental check more difficult. The paper analyzed the main problems encountered during environment check and approval of railway electrification engineering and raised several suggestions.
作者 周辉宇
出处 《环境影响评价》 2015年第4期51-53,共3页 Environmental Impact Assessment
关键词 既有铁路 电气化改造 环保验收 existing railways electrification environmental check and approval upon project completion
  • 相关文献

参考文献6

  • 1铁道部.2003年铁道统计公报[N].人民铁道,2004—03-27.
  • 2国家铁路局.2013年铁道统计公报[EB/OL]. http://www.nra.gov.cn/fwyd/zlzx/hytj/201404/t20140410_5830.htm,2014-10-6.
  • 3中铁第四勘察设计院集团有限公司.建设项目竣工环境保护验收调查报告--改建铁路京包线大同至包头段电气化改造工程[R],武汉:中铁第四勘察设计院集团有限公司,2013.
  • 4中铁第四勘察设计院集团有限公司.建设项目竣工环境保护验收调查报告--改建铁路浙赣线电气化提速改造改造工程[R],武汉:中铁第四勘察设计院集团有限公司,2011.
  • 5中铁第四勘察设计院集团有限公司.建设项目竣工环境保护验收调查报告--改建铁路焦柳线洛阳至张家界段电气化工程[R],武汉:中铁第四勘察设计院集团有限公司,2014.
  • 6姜海波.铁路建设项目竣工环境保护验收调查内容及存在问题的思考[J].铁道劳动安全卫生与环保,2009,36(5):247-250. 被引量:7

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部