摘要
构建了后方仓库综合技术保障中心建设方案综合评估指标体系,先运用多人层次分析法对评价指标进行主观赋权,再对指标权值加以客观修正,从而得到较为客观准确的综合权重,最后运用模糊综合评价法对若干备选方案进行评判,得到各备选方案的评级结果,并从中选择最优方案。算例分析表明,该方法能够较好地适用于建设方案的评价,得出的量化描述结果可以作为建设方案评判与选择的参考依据。
The evaluation index system of construction scheme of comprehensive technical support center in strategic bouk- side warehouse is established. Using the group analytic nierarchy process (GAHP), the subjective weights are obtained firstly, then the changeable synthetic weights are formed by means of modifying the obtained subjective weights and thus the comprehensive weights can be computed. Finally according to the results of synthetic evaluation obtained by applying fuzzy synthetic evaluation method to each construction scheme, the optimum scheme can be selected. Case results demonstrate that the proposed method is beneficial to evaluate construction scheme of the center.
出处
《后勤工程学院学报》
2015年第4期63-69,共7页
Journal of Logistical Engineering University
基金
全军后勤科研计划项目(CS114L003)