锦屏二级水电站进水口基坑泥沙控制及水下清淤施工 被引量:8

Sediment Control and Removal Under Water in Intake Foundation Pit at Jinping ⅡHydropower Station
下载PDF
导出
摘要 锦屏二级水电站进水口为独立岸塔式进水口,进水口底板低于河床高程。在进水口建筑物形成后,限制泥沙进入拦污栅后和闸前引水隧洞空间,以减少悬移质泥沙进入进水口基坑的总量,并采取措施在汛期有水状态下进行基坑淤沙清理,取得了较好的效果。 Intake in Jinping II hydropower station is a single intake tower. The intake bottom is lower than riverbed elevation. After building of intake structure,sediment is restricted to enter behind trashrack and in headrace tunnel before gate so as to decrease total amount of suspended load sediment which flow into foundation pit of intake. Some measures are taken during flood seasons to remove sediment from foundation pit.This practice will provide references to the similar sediment control and treatment projects.
作者 吴晓伟
出处 《四川水力发电》 2015年第A01期63-65,124,共3页 Sichuan Hydropower
关键词 进水口基坑 泥沙控制 水下清淤 锦屏二级水电站 intake foundation pit sediment control sediment removal under water
  • 相关文献

同被引文献51

引证文献8

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部