摘要
为节约厂用电、减少设备维护成本、简化引风机的DCS控制方式,对某1 000 MW机组进行了引风机与脱硫增压风机合并后采用小汽轮机驱动引风机的改造。在汽动引风机调试过程中进行汽动引风机并入运行、最大出力试验,并对启动过程中的风机抢风现象给出了操作建议。
In order to save auxiliary power, reduce equipment maintenance cost and simplify DCS control mode of induced draft fan, in a 1 000 MW units transformation the induced draft fan and boost fan are com-bined and small steam turbine is adopted to drive the induced draft fan. During commissioning of steam-driven induced draft fan, parallel operation and maximum output tests are carried out; besides, operation sugges-tions on headreach of the induced draft fan during startup is given.
出处
《浙江电力》
2015年第7期46-48,共3页
Zhejiang Electric Power
关键词
锅炉
汽动引风机
并列运行
分析
boiler
steam-driven induced draft fan
paralleled operation
analysis