变电站主变压器跳闸故障原因判断方法分析 被引量:2

Fault Analysis and Its Treatment to Transformer Tripping in Substation
下载PDF
导出
摘要 内蒙古巴彦淖尔地区某110 k V变电站主变压器由于恶劣的气象条件导致跳闸故障,造成主变压器三侧断路器跳开,差动保护和本体重瓦斯保护动作。事故发生后,采用油色谱分析、绕组变形及直流电阻测试、电容量变化率分析等多种方法判断主变压器的受损部位、受损程度,经验证发现试验结论均一致。本文采用的几种方法可为今后其他变电站准确判断变压器受损部位及受损程度提供参考。 A 110 kV substation main transformer in Bayannur region of Inner Mongolia fauh tripping due to bad weather conditions, cause the circuit breaker tripping on the three side of the transformer, differential protection and the weight of the gas protection action. To the accident, use oil chromatographic analysis, the winding deformation and dc resistance test, capacity rate analysis methods such as judge the damage, the damaged degree of the main transformer, to verify the fault and found that the test results are consistent. Several ways used in this paper provide a reference for other substations to accurately diagnose transformer faults in future.
机构地区 巴彦淖尔电业局
出处 《内蒙古电力技术》 2015年第3期18-21,共4页 Inner Mongolia Electric Power
关键词 变压器 跳闸故障 电容量变化率 绕组变形 短路阻抗 transformer transformer trip fault capacitance change rate windingdeformation short circuit imdepedance
  • 相关文献

参考文献5

  • 1中华人民共和国电力工业部.DIJT596-1996电力设备预防性试验规程[S].北京:中国电力出版社,1997.
  • 2国网北京电力建设研究院,主编.GB50150-2006电气装置安装工程电气设备交接试验标准[S].北京:中国计划出版社.2006.
  • 3内蒙古电力(集团)有限责任公司.输变电设备状态检修试验规程[R].呼和浩特:内蒙古电力(集团)有限责任公司.2014.
  • 4电力行业高压试验技术标准化技术委员会.DUT911-2004电力变压器绕组变形的频率响应分析法[S].北京:中国电力出版社,2005.
  • 5国家电网公司.国家电网公司十八项电网重大反事故措施[M].北京:中国电力出版社,2011:31.