期刊文献+

Profit loss indicator:a novel maintenance indicator applied for integrated planning 被引量:1

Profit loss indicator:a novel maintenance indicator applied for integrated planning
原文传递
导出
摘要 In production environment today, "silo think- ing" is a challenge where controlling an asset associated with several disciplines and departments can lead to a sub- optimal result. This requires a more integrated approach with an integrated planning (IPL) framework. In this framework novel maintenance key performance indicators (KPIs) are needed. The purpose of this article is to develop the novel maintenance KPI profit loss indicator (PLI). This indicator is based on measuring both on the "hidden fac- tory" and waste in production, presenting it as a financial measure. The notion "hidden factory" is used as a meta- phor for measuring the time losses in industry through the maintenance KPI overall equipment effectiveness (OEE). This indicator divides the time losses into availability losses, performance losses and quality losses. In addition, a financial measure for waste based on literature from Toyota production system (TPS) and waste treatment and disposal is also included in PLI. Through a case study in the saw mill industry PLI is demonstrated and evaluated. It is expected that this indicator will be demonstrated in several industry branches in the future. In production environment today, "silo think- ing" is a challenge where controlling an asset associated with several disciplines and departments can lead to a sub- optimal result. This requires a more integrated approach with an integrated planning (IPL) framework. In this framework novel maintenance key performance indicators (KPIs) are needed. The purpose of this article is to develop the novel maintenance KPI profit loss indicator (PLI). This indicator is based on measuring both on the "hidden fac- tory" and waste in production, presenting it as a financial measure. The notion "hidden factory" is used as a meta- phor for measuring the time losses in industry through the maintenance KPI overall equipment effectiveness (OEE). This indicator divides the time losses into availability losses, performance losses and quality losses. In addition, a financial measure for waste based on literature from Toyota production system (TPS) and waste treatment and disposal is also included in PLI. Through a case study in the saw mill industry PLI is demonstrated and evaluated. It is expected that this indicator will be demonstrated in several industry branches in the future.
出处 《Advances in Manufacturing》 SCIE CAS CSCD 2015年第2期139-150,共12页 先进制造进展(英文版)
基金 petroleum industry(IO Center)for funding this research the support and important input from the Chief Engineer Frode Edvardsen in this company in order to perform the PLI calculations
关键词 Integrated planning (IPL) - Maintenanceperformance Key performance indicator (KPI) Hidden factory WASTE Asset management Integrated planning (IPL) - Maintenanceperformance Key performance indicator (KPI) Hidden factory Waste Asset management
  • 相关文献

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部