期刊文献+

更换零件能力对手工装配系统合格率的影响

Effect of Parts Replacement Capacity to Qualified Rate in Manual Assembly System
下载PDF
导出
摘要 漏装和错装是手工装配系统的主要质量问题,更换零件是应对这类问题的主要方式。为了合理地规划手工装配系统的零件更换能力,研究了零件更换能力对手工装配系统合格率的影响。拓展了手工装配系统,建立了包含更换零件能力的手工装配系统概念模型,构建了手工装配系统合格率的计算表达式。分析了零件更换能力充分和不充分两种情况下,手工装配系统合格率和零件更换能力之间的关系,得出了在零件更换能力不充分时,合格率随零件更换能力的增大而增大,当零件更换能力达到某个值时,合格率不再变化。求解了合格率不变时的零件更换能力临界值的表达式。最后用企业实例进行了说明,并分析了手工装配系统合格率和首检合格率、返工合格率与首检合格率的比值ρ的敏感性。 Missing parts and the wrong parts are the main quality problems in manual assembly system,parts replacement is the main way to deal with these problems. In order to make a rational plan for parts replacement capacity,the effect of parts replacement capacity to qualified rate was studied. A manual assembly system concept model included parts replacement capacity was established, and a calculation expression for qualified rate in manual assembly system was built. The relationship between quality buy rate and replacement parts capability in manual assembly system was studied,and the result that quality buy rate increases with the parts replacement capacity in case of insufficient parts replacement capacity and quality buy rate is stable in case of sufficient parts replacement capacity. An example is provided to analyze the sensitivity. The results in this paper can provide theoretical and method support for manual assembly system planning,design and operation.
出处 《杭州电子科技大学学报(自然科学版)》 2015年第3期101-105,共5页 Journal of Hangzhou Dianzi University:Natural Sciences
基金 浙江省自然科学基金资助项目(LY13G010007 LY14G020014) 浙江省人文社科基地资助项目(RWSKZD01-201202)
关键词 手工装配系统 更换零件能力 合格率 质量问题 manual assembly systems parts replacement capability qualify rate quality problem
  • 相关文献

参考文献3

二级参考文献31

  • 1戴立操,张力,黄曙东.复杂工业系统中人因失误根本原因分析[J].中国安全科学学报,2003,13(11):13-16. 被引量:15
  • 2戴立操,张力,黄曙东.核电厂HRA定性评价及应用[J].工业工程与管理,2005,10(1):17-20. 被引量:2
  • 3赵韩,何俊明.论虚拟生产系统的制造资源组织模式及其系统构建算法[J].中国机械工程,2006,17(10):1036-1040. 被引量:3
  • 4张孝令,贝叶斯动态模型及其预测,1992年
  • 5Wilson J R,Koubek R J,Salvendy G,Sharit J,Karwowski W.Human factors in advanced manufacturing:a review and reappraisal[A].Karwowski W,Salvendy G.Organization and management of advanced manufacturing[C].New York:Wiley,1994.
  • 6Slack N,Chambers S,Johnston R.Operations management(third ed)[M].Harlow:Financial Times Prentice Hall,2001.
  • 7M.Paz Barroso,Wilson J R.Human error and disturbance occurrence in manufacturing systems:a framework and a toolkit for practical analysis[J].Cognition,Technology & Work,2000,2:51-61.
  • 8Jarvinen J,Karwowski W.Analysis of self-reported accidents attributed to advanced manufacturing systems[J].International Journal of Human Factors in Manufacturing,1995,5(3):251-266.
  • 9Kuivanen R.The impact of safety disturbances in flexible manufacturing systems[A].Karwowski W,Rahimi M.Ergonomics of hybrid automated systems Ⅱ[M].Elsevier,Amsterdam,1990:951-956.
  • 10Jarvinen J,Vannas V,Mattila M,Karwowski V.Causes and safety effects of production disturbances in FMS installations:a comparison of field survey studies in the USA and Finland[J].International Journal of Human Factors in Manufacturing,1996,6(1):57-72.

共引文献75

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部