摘要
对三山岛金矿破碎系统进行优化改造,提出多项改造方案,结合三山岛金矿发展规划,优化方案比较,本着投资少,建设周期短等因素,选择合适的改造方案,同时达到提高碎矿单位处理能力,缩短碎矿时间,降低碎矿电耗,降低碎矿粒度,提高选矿处理能力,增加黄金产量,降低生产成本的目的。
Multidirectional reconstruction scheme was proposed to reform the crushing system of Sanshandao Gold Mine.Combined with the development planning of Sanshandao Gold Mine and compared with different scheme,the low investment and short construction cycle scheme was choosed.The scheme can achieve the purpose of improving the crushing processing ability,shortening the crushing time,reducing crushing power consumption,improving the beneficiation processing ability,improving the gold output,reducing the producing cost.
出处
《价值工程》
2015年第25期226-228,共3页
Value Engineering
关键词
三山岛金矿
选矿
破碎
改造
成本
Sanshandao Gold Mine
milling of ores
crushing
reform
producing cost