基于神经网络的大型国际工程财务风险控制评价 被引量:10

Financial Risk Control Evaluation in International Megaprojects Based on Back Propagation Neural Network
下载PDF
导出
摘要 建立了一个由7个一级指标和32个二级指标构成的系统评价体系.采用模糊层次分析法(FAHP)并结合专家问卷数据得到初始指标权重,进而生成30组前馈神经网络(BPNN)训练样本和5组校验样本.基于训练样本和前馈神经网络构建出大型国际工程项目财务风险控制体系的非线性映射关系模型,并通过样本校验.最后,以某大型央企在沙特的总承包项目为例,进行了评价体系的实际应用和案例分析. An evaluation framework consisting of 32 evaluation indicators grouped under 7 categories was built.The weights of the indicators were obtained through an expert questionnaire survey and were then computed using fuzzy analytic hierarchy process(FAHP),which generated 30 groups of back propagation neural network(BPNN)training samples and 5 sets of calibration samples.Based on the results,a nonlinear mapping relation model of the financial risk control of international megaprojects was constructed.Finally,an EPC(engineering,procurement,construction)project in Saudi Arabia was used as a case to illustrate the evaluation system.
出处 《同济大学学报(自然科学版)》 EI CAS CSCD 北大核心 2015年第7期1104-1110,共7页 Journal of Tongji University:Natural Science
基金 国家自然科学基金(71471137)
关键词 财务风险控制 大型国际工程项目 模糊层次分析法(FAHP) 前馈神经网络(BPNN) financial risk control international megaprojects fuzzy analytic hierarchy process(FAHP) back propagation neural network(BPNN)
  • 相关文献

参考文献12

  • 1Bing L,Tiong R L K,Fan W W,et al.Risk management in international construction joint ventures[J].Journal of Construction Engineering and Management,1999,125(4):277.
  • 2Ling F Y Y,Hoi L.Risks faced by Singapore firms when undertaking construction projects in India[J].International Journal of Project Management,2006,24(3):261.
  • 3王玲,刘建林,朱记伟.基于AHP-MF模型的国际水电EPC项目风险评价研究[J].工程管理学报,2012,26(4):82-86. 被引量:34
  • 4Van Horne J C,Wachowicz J M.Fundamentals of financial management[M].New Jersey:Pearson Education,2008.
  • 5Trindade A A,Zhu Y.Approximating the distributions of estimators of financial risk under an asymmetric Laplace law[J].Computational Statistics&Data Analysis,2007,51(7):3433.
  • 6Beasley M S.Fraudulent financial reporting(1998—2007):an analysis of US public companies[R].Orlando:Committee of Sponsoring Organizations of the Treadway Commission,2010.
  • 7朱毅,李吉勤,魏焱,李慧,南松,李小冬.基于总承包商视角的EPC国际工程风险因素分级研究[J].工程管理学报,2012,26(5):1-6. 被引量:42
  • 8HAN Peng,LIU Yisheng.Study on the risk analysis and prevention for international project[C]//Proceedings of the2011 International Conference on Information,Services and Management Engineering.Wuhan:Scientific Research Publishing,2011:1868-1887.
  • 9李小冬,杨帆,李吉勤,南松,杨勇.国际工程项目风险管理辅助决策支持体系及要素研究[J].建筑经济,2014,35(5):34-39. 被引量:5
  • 10Williamson D.The COSO ERM framework:a critique from systems theory of management control[J].International Journal of Risk Assessment and Management,2007,7(8):1089.

二级参考文献26

共引文献73

同被引文献67

引证文献10

二级引证文献53

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部