内官—香泉盆地是引洮供水工程的主要灌区,在计算得出该地区水文地质参数的基础上,将该地区分为香泉盆地、卧龙川盆地、内官盆地,计算了引洮供水工程实施前后的地下水资源量,并进行了地下水均衡分析。结果表明:工程实施前,3个盆地地下水的排泄量均大于补给量,均呈负均衡状态;工程实施后,地下水处于正均衡状态,香泉、卧龙川、内官盆地的地下水资源量分别为42615万、13467万、69976万m3/a,近期6 a内官盆地和香泉盆地不会出现土壤次生盐渍化问题,卧龙川盆地出口陆家庄—中庄剖面以南约18 km的区域出现不同程度的土壤次生盐渍化问题,分布面积约207 km2。
The Neiguan-Xiangquan basin is the main irrigation area of the Taohe River water diversion project. Based on the calculation of hydrogeological parameters,it divided the basin into Xiangquan basin,Wolongchuan basin and Neiguan basin to calculate before and after the Taohe River water diversion project of groundwater resources and analyzed the groundwater balance. The results show that the output of the three basin groundwater area is greater than recharge before the implementation of project,showing negative equilibrium. After implementing the project,the groundwater is in the statement of positive equilibrium. The groundwater resources of Xiangquan,Wolongchuan and Neiguan basins are 4. 2615 million,1. 3467 million and 6. 9976 million m^3/a respectively. Neiguan and Xiangquan basin will not have soil secondary salinization problems within recent 6 a. In the south about 1. 8 km area of Lujiazhuang to Zhongzhuang profile of Wolongchuan basin appears different degrees of secondary soil salinization. The distribution area is about 2. 07 km^2 .
出处
《人民黄河》
CAS
北大核心
2015年第8期83-85,共3页
Yellow River
关键词
地下水
补给量
排泄量
引洮供水工程
内官—香泉盆地
groundwater
recharge
output
Taohe River water diversion project
Neiguan-Xiangquan basin