摘要
结合山地型风电场特点,提出竣工环保验收调查要求,并详细分析生态环境影响调查、声环境影响调查及固体废物环境影响调查等重点环节验收中需要注意的问题。
Combined with the characteristics of mountain type wind farm, this paper proposed requirement for completion environmental protection acceptance survey, and analyzed issues that required attention in key acceptance aspects of ecological environmental impact survey, acoustic environmental impact survey and solid waste environmental impact survey in a detailed analysis.
出处
《能源与节能》
2015年第8期71-72,共2页
Energy and Energy Conservation
关键词
风力发电
竣工环保验收
技术要点
wind power generation
completion acceptance of environmental protection
technical points