软土地基市政排水管道沉降原因分析及对策 被引量:1

Analysis of Settlement Cause and Countermeasures of Municipal Drainage Pipe in Soft Subgrade
下载PDF
导出
摘要 以工程实测数据资料为基础,从管道铺设开挖沟槽卸土回弹后在回填土体自重压力下的再压缩,围护桩体打、拔扰动造成的管道周边及基础土体损失,管道上部回填料松散引起的自密实压缩变形等几方面原因,对软土地基场地条件下铺设的市政排水管道工后沉降原因进行了详细分析,并提出了减少排水管道工后沉降的相应对策。 Based on the measured data of the project, the article analyzes the settlement causes of municipal drainage pipe laid in soft subgrade after construction from the aspects of the re-compression of rebounded trench bottom soil in gravity load of backfilling, the soil losing surrounding the pipe and foundation caused by the inserting and pulling of enclose piles, and the self-compacting compression deformation caused by loose backfilling material above pipe, and puts forward the relative countermeasures to decrease the settlement of drainage pipe after construction.
作者 杨滨
出处 《城市道桥与防洪》 2015年第8期90-93,13,共4页 Urban Roads Bridges & Flood Control
关键词 排水管道 软土地基 沉降 drainage pipe,soft subgrade,settlement
  • 相关文献

参考文献4

  • 1GB50332-2002.给水排水工程管道结构设计规范[S].[S].,..
  • 2GB50007-2011建筑地基基础设计规范[S].2001.
  • 3上海市排水管道通用图PSAR-D-01-92[Z].上海:上海市城市建设设计院,1992.
  • 4朱炳寅,娄宇,杨琦.建筑地基基础设计方法及实例分析(第二版)[M].北京:中国建筑工业出版社.2013.

共引文献423

同被引文献7

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部