摘要
针对装甲装备初始定时维修方案制定对经验的依赖性,以维修保障综合信息为基础,通过装备效能以及期望维修费用模型的构造,对定时维修间隔期进行优化,并构造了兼顾可用度及期望维修费用的组合模型,最后通过实例验证了该模型的有效性及实用性。
In view of the reliant of armoured equipment time-based maintenance concept formulation on the experience,and based on the maintenance support comprehensive information,the time-based maintenance period though the establishment of effectiveness model and maintenance cost model is optimized,and attempt to construct the comprehensive model that giving consideration to both maintenance expenses and availability. The effectiveness and practicability with an example is illustrated at last.
出处
《火力与指挥控制》
CSCD
北大核心
2015年第8期131-135,共5页
Fire Control & Command Control
基金
军队"十二五"装备预先研究基金资助项目
关键词
维修保障信息
定时维修间隔期优化
可用度
维修费用
maintenance support comprehensive information
time-based maintenance period optimization
availability
maintenance expenses