港珠澳大桥墩柱干接缝结构匹配预制技术 被引量:11

Matching precast technology in piers dry joints of Hongkong-Zhuhai-Macao Bridge
下载PDF
导出
摘要 结合港珠澳大桥超高墩柱分节预制拼装工艺,研究干接缝结构匹配预制的翻模技术、机加工钢模具技术、钢混凝土结合底模具技术,以及预应力粗钢筋系统精度控制技术,实现了墩柱干接缝结构竖向对接的匹配预制。 Combining with the segment prestressed assembly technique of the high piers of the Hongkong-Zhuhai-Macao Bridge, we studied the matching precast technologies in piers dry joints, such as the turnover formwork technology, machining steel mold technology, steel-concrete combination bottom mold technology, and the system accuracy control technology of prestressed reinforcing steel bar, which realizes the matching precast of piers dry joints' vertical butt joint.
出处 《中国港湾建设》 2015年第8期49-52,共4页 China Harbour Engineering
关键词 墩柱干接缝 竖向对接 匹配预制 预应力粗钢筋 piers dry joints vertical butt joint matching precast prestressed crude steel
  • 相关文献

参考文献3

  • 1港珠澳大桥管理局.港珠澳大桥主体工程桥梁工程施工及质量验收标准[s].2012.
  • 2陈宏钧.机加工技术手册[M].北京:机械工业出版社,2008.
  • 3港珠澳大桥管理局.港珠澳大桥桥梁工程预应力粗钢筋及其锚固体系技术要求[S].2012.

共引文献1

同被引文献86

引证文献11

二级引证文献60

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部