采用铁、铝极板电絮凝法处理实验室模拟含磷废水,探究了通电电压、极板间距、通电时间及初始p H等主要参数对除磷效果的影响。结果表明:通电电压、极板间距、通电时间及初始p H均能影响除磷效果,铝、铁电极对磷的去除率最高可以达到96.8%、99.5%。在试验条件下,得到以铝板为极板去除废水中磷的最优操作条件为:极板间距2.5cm,通电电压为25V,通电时间25min左右,初始溶液p H为7.0。并且根据反应动力学试验证明了铁、铝极板电絮凝除磷反应均为一级反应,其反应速率常数分别k=0.015506,k=0.02309。
Phosphorus wastewater was treated by Electro-coagulation with iron,aluminum plate in this paper. The factors such as electrolysis voltage,interelectrode distance,electrolysis time and Initial p H on the adsorption rate of phosphorus. The results showed electrolysis voltage,interelectrode distance,electrolysis time and Initial p H could affect the removal rate of phosphorus. The removal rate of phosphorus could reach above 96.8% 、99.5%when using iron, aluminum plate. And in this Experimental conditions,when using the aluminum plate,the optimal operating conditions were:Interelectrode distance 2.5cm,electrolysis voltage of 25 V, electrolysis time is about 25 min, the initial solution p H of 7.0.And that the reaction of removing phosphorus using the iron,aluminum plate was proved to be first order reaction based on kinetic experiments,and the reaction rate constant were k =0.015506, k = 0.02309.
出处
《能源环境保护》
2015年第4期12-15,共4页
Energy Environmental Protection
关键词
电絮凝
含磷废水
处理
Electro-coagulation phosphorus wastewater treatment.