多级项目进度风险预警系统的研究 被引量:2

Research and Design of Multi-level Schedule Pre-warning System
下载PDF
导出
摘要 在企业项目管理中,由于项目复杂多级,传统的风险预警方法常常忽视其内部复杂的逻辑关系,从而容易出现预警结果与实际执行情况不符,无法实现对进度监控预警的作用。根据项目的层次结构,从任务级别、节点级别及项目级别对项目进度风险实现分级监测和预警,提出了多级进度风险预警系统。各级预警阶段通过进度的层层反馈联动,从而实现对项目进度状况的掌控,及时纠正出现的进度偏差,确保项目的如期完成。 At present, project is big in quality and complex in logic of Enterprise Project Management. Traditional methods of pre-warning usually neglect the complex logic relationship among projects, thus leading to inconformity of pre-warning re-sults and actual implementation. As a result, pre-warning is useless on schedule monitor. According to project's hierarchy, a multi-level schedule pre-warning system was proposed to monitor and give pre-warnings from mission level, node level and project level individually. Each pre-warning level was linked by feedback. Therefore, the system can control the project's pro-gress and correct abnormality to achieve pre-warning.
出处 《武汉理工大学学报(信息与管理工程版)》 CAS 2015年第4期509-513,共5页 Journal of Wuhan University of Technology:Information & Management Engineering
关键词 进度风险预警 多级监控 进度反馈 进度偏差率 缓冲时间 schedule pre-warning multi-level monitoring schedule feedback rate of schedule deviation buffer time
  • 相关文献

参考文献10

二级参考文献74

共引文献71

同被引文献10

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部