露天煤矿采区接续工程位置确定及转向方式研究 被引量:8

Study on connection engineering location determination and turnaround method of mining block in surface mine
下载PDF
导出
摘要 为了更好地提高露天煤矿转向效率和经济效益,对采区最佳接续工程位置和转向方案的优选方法进行研究。基于不同方案的工程特点、适用范围,明确了采区接续期间的限制因素和优化因素,提出了剥采工程量表叠加法确定采区接续工程位置确定方法。对安家岭露天煤矿的转向方案进行研究,设计了4种可行方案,并综合边坡和经济耦合的目标优选采区转向方案,结果表明:安家岭露天煤矿最佳转向方式为L形转向方案,最佳转向接续工程位置为21号位置。 In order to well improve a turnaround efficiency and economic benefit of the surface mine, a study was conducted on the opti- mized method of the optimum connection engineering location and the turnaround plan.Based on the engineering features and application scope of the different plan, the limited factors and optimized factors during the connection period of the mining block were clarified and the superposition method of the stripping quantity table was provided to determine the connection engineering location of the mining block. A study was conducted on the turnaround plan of Anjialing Surface Mine.There were four feasible plans designed.The mining block turn- around plan was optimized with the comprehensive slope and economic coupled target and the results showed that the best turnaround method of Anjialing Surface Mine was a L turnaround plan and the best turnaround connection engineering location was at No. 21 location.
作者 王肇东
出处 《煤炭科学技术》 CAS 北大核心 2015年第8期34-39,共6页 Coal Science and Technology
基金 国家自然科学基金重点资助项目(51034005)
关键词 露天煤矿 分区开采 转向方案 剥采工程 surface mine mining by areas turnaround plan stripping engineering
  • 相关文献

参考文献18

二级参考文献49

共引文献255

同被引文献79

引证文献8

二级引证文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部