期刊文献+

产能及周期约束下制造系统能力配置优化 被引量:5

Capacity configuration optimization for manufacturing system with constrains of throughput and flow time
下载PDF
导出
摘要 定制型装备制造系统设备能力配置优化属于非线性整数规划问题。由于产能、周期约束均无法封闭表达等原因,其精确解求取非常困难。为此,提出一种目标函数最优值上、下界逐步逼近的近似优化方法。描述了定制型装备制造系统能力配置问题,并以最小化设备投资为目标建立了数学模型;介绍了数学分析与仿真优化相结合的近似优化方法整体思路;阐述了目标函数最优值初始上、下界的获取,逐步改进直至逼近目标函数最优值的过程。通过实例验证了所提方法,并与产能单约束能力配置结果进行了对比。分析表明考虑周期约束将增加设备投资,所提方法和所获结果可为企业优化配置资源提供决策支持。 The facility capacity configuration optimization of order-driven equipment's manufacturing system belongs to nonlinear integer programming problem. Owing to the reasons that the throughput and flow time constrains could not be described by closed form, an approximate optimization method of approaching the optimal value of objective function by its upper and lower bound was proposed. The capacity configuration of order-driven equipment's manu facturing system was described, and the mathematical model was developed with the object of minimum facility cost. The composition of approximate optimization method integrated mathematical analysis with simulation optimization was introduced. The process of acquiring the initial value's upper and lower bound and approaching to the optimal value of objective function was presented in detail. The proposed method was verified by the case study, and the re- suits were compared with the situation of throughput single constrain. The analysis showed that the proposed meth- od could provide decision support for optimization allocation of enterprises resource.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2015年第7期1744-1755,共12页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(51175094 51375098) 广东省教育部产学研结合示范基地资助项目(2012B091000061)~~
关键词 定制型装备 能力配置优化 制造系统 产能 周期 近似优化方法 order-driven equipment capacity configuration optimization manufacturing system throughput flow time approximate optimization method
  • 相关文献

参考文献16

二级参考文献73

共引文献48

同被引文献32

  • 1刘天湖,陈新度,陈新,吴磊,曾伟燕.设计项目的分解和资源配置[J].机械设计与制造,2005(7):31-33. 被引量:1
  • 2黎文瑞,陈庆新,毛宁,俞爱林.随机生产环境下的模具制造单元资源配置[J].计算机集成制造系统,2007,13(11):2189-2194. 被引量:6
  • 3史宪铭,郭波,武小悦,梁亮.基于排队网络的快速研制系统模型研究[J].系统工程学报,2007,22(6):654-658. 被引量:3
  • 4SINGH A, SMITH J M. Buffer allocation for an integer non- linear network design problem[J].Computers and Operations Research, 1997,24(5) :453-472.
  • 5SMITH J M, CRUZ F R B, VAN WOENSEL T. Topological network design of general, finite, multi-server queueing net- works[J]. European Journal of Operational Research, 2010, 201(2) :427-441.
  • 6BOLCH G, GREINER S, DE MEER H, et al. Queueing net- works and Markov chains[M]. 2nd ed. New York, N. Y. , USA:John Wiley & Sons,2006.
  • 7HASKOSE A, KINGSMAN B G, WORTHINGTON D. Per- formance analysis of make-to-order manufacturing systems un- der different workload control regimes[J]. International Jour- nal of Production Economics, 2004,90(2) : 169-186.
  • 8KERBACHE L, SMITH J M. Asymptotic behavior of the ex- pansion method for open finite queueing networks[J]. Comput-ers and Operations Research, 1988,15(2) :57-169.
  • 9SMITH J M. Properties and performance modelling of finite buffer M/G/1/K network[J]. Computers and Operations Re- search,2011,38(4) :740-754.
  • 10俞爱林,陈庆新,毛宁.基于典型零件的模具企业中长期设备资源规划建模[J].模具工业,2009,35(8):1-5. 被引量:7

引证文献5

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部