摘要 为分析供应链运作机制对降低产能不确定和需求不确定的影响,对比研究了MOI和VMI两种供应链运作模式下单关键零部件供应商-单制造商组成的两级供应链系统。MOI模式下,制造商负责产品的库存决策,并承担相应的零部件库存成本和缺货成本;VMI模式下,供应商负责产品的库存决策和额外产能储备决策,并承担相应的零部件库存成本和过剩能力闲置成本。给出了供应链的最优解及期望利润;为进一步讨论供应链管理模式对提升供应链运作效率的管理意义,分析了随机需求、随机产能及批发价格对两种模式的影响。 To analyze the effects of operation mode of supply chain on supply chain performance under uncertain capacity and uncertain demand, a decentralized supply chain consisting of one supplier (providing key component) and one manufacturer under Manufacture Owned Inventory (MOI) and Vendor Managed Inventory (VMI) is studied. Under MOI, the manufacturer is fully responsible for the inventory decision of product, and bears component inventory cost and product shortage cost. Under VMI, the supplier is fully responsible for decisions of extra capacity and product inventory, and bears component inventory cost and idle capacity cost. Optimal decisions and expected supply chain profit under MOI and VMI are put forwards. To identify managerial insights that how supply chain arrangement improves supply chain efficiency, we investigate the effects of demand uncertainty, capacity uncertainty, and component wholesale price,on the behavior under MOI and VMI.
出处 《工业工程与管理》 CSSCI 北大核心 2015年第4期108-115,129,共9页 Industrial Engineering and Management
基金 国家自然科学基金资助项目(71072035)
关键词 产能不确定 需求不确定 制造商持有库存 供应商管理库存 capacity uncertainty demand uncertainty MOI VMI
  • 相关文献

参考文献18

  • 1Kulkarni S. The impact of uncertain yield on capacity acquisition in process plant networks [J]. Mathematical and Computer Modeling, 2006,43 .. 704-717.
  • 2Bassok Y, Hopp W J, Rohatgi M. A simple linear heuristic for the service constrained random yield problem [J 1. liE Transactions, 2002,34(5) : 479-487.
  • 3Schmitt A J. Strategic inventory management for supply chains subject to supply uncertainty [D]. Graduate and Research Committee of Lehigh University, 2007.
  • 4TomlinB. On the value of mitigation and contingency strategies for managing supply chain disruption risks [J]. Management Science, 2006,52 (5) : 639-657.
  • 5Tomlin B. Disruption-management strategies for short life-cycle products[J]. Naval Research Logistics, 2009,56 .. 318-347.
  • 6Bollapragada S, Morton T E. Myopic heuristics for random yield problem[J]. Operations Research, 1999,47(5) : 713-722.
  • 7Gerchak Y, Wang Y, Yano C A. Lot sizing in assembly systems with random component yields[J]. IIE Transactions, 1994,26 (2) .. 19-24.
  • 8Gurnani H, Akella R, Lehoczky J. Supply management in assembly systems with random yield and random demandEJ]. IIE Transactions, 2000,32 (8) .. 701-714.
  • 9Ciarallo F W, Aketla R, Morton T E. A periodic review, production planning model with uncertain capacity and uncertain capacity and uncertain demand-optimality of extended myopic policies[J]. Management Science, 1994, 40 (3) .. 320-332.
  • 10Farh J L,Earley P C, Lin S C. Impetus for action: A cultural analysis of justice and organizational citizenship behavior in Chinese society[J]. Administrative Science Quarterly, 1997,42 (3) :421-444.

二级参考文献34

共引文献24

同被引文献28

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部