摘要
介绍船行波的两种算法,着重运用Flory-Remery算法通过OPTIMOOR系泊软件,结合巴基斯坦某港7.5万吨级煤码头,分析临近进港航道建设码头泊位时船行波荷载对码头泊位上系泊船的影响,并提出不影响系泊船正常作业的临界航速,供类似工程参考。
Two methods for calculating the ship wave's effect on the moored ship are introduced. Combining with a 75 000 DWT coal terminal in Pakistan and adopting the Flory-Remery method using OPTIMOOR software, we analyze the effect of the ship wave load on the ship moored on the jetty which is near to fairway, and give the critical speed of the passing ship when the normal operation of the moored ship is not affected.
出处
《水运工程》
北大核心
2015年第9期28-34,共7页
Port & Waterway Engineering