糯扎渡水电站进水口叠梁门分层取水设施运行方式研究 被引量:10

Study on Operating Method of Multi-level Intake Structure with Stoplog Gate of Nuozhadu Hydropower Station
原文传递
导出
摘要 鉴于糯扎渡电站进水口叠梁门分层取水设施的建设和运行管理缺乏经验,通过河道天然水温数据统计分析和水库水温分布结构预测,确定了糯扎渡电站进水口叠梁门分层取水设施的运行时段、运行水位、下泄水温的调控目标,并结合电站发电、防洪及航运等多目标水库运行要求,明确了进水口叠梁门分层取水运行方式,为电站投运后叠梁门多层取水提供了依据。 In view of the construction and operation of Nuozhadu hydropower station intake stoplog gate facilities lack of experience,this paper identified the operation time and water level,water temperature regulation target of Nuozhadu hydropower station stoplog gate by analyzing natural river water temperature data statistics and predicting reservoir water temperature distribution structure.And then it provide the basis for operation through the operation mode of stoplog gate was identified which has combined with multi-objective reservoir operation requirements including power generation,flood control and shipping.
出处 《水电能源科学》 北大核心 2015年第10期79-83,共5页 Water Resources and Power
基金 国家"十二五"科技支撑计划课题(2013BAB06B04)
关键词 糯扎渡水电站 叠梁门 分层取水 运行方式 Nuozhadu hydropower station stoplog gate multi-level intake structure operating method
  • 相关文献

参考文献8

二级参考文献43

共引文献111

同被引文献90

引证文献10

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部