期刊文献+

某LNG码头项目泊位长度的优化 被引量:8

Length Optimization of LNG Berths
下载PDF
导出
摘要 本研究依托工程实例,运用OPTIMOOR系泊软件,模拟不同泊位长度下LNG码头的系泊安全。以均衡缆绳张力,避免个别缆绳破断,减小船舶运动量为优化目标,推荐泊位长度约为1.2倍船长。 Relying on an engineering practice, OPTIMOOR software was used to simulate the mooring security of LNG wharf when the berth lengths were different. About 1.2 times vessel length was recommended as the berth length in order to balance the tension of cable, avoid the breakage of partial cable and reduce the movement of vessel.
出处 《港工技术》 2015年第5期49-50,84,共3页 Port Engineering Technology
关键词 OPTIMOOR 泊位长度 LNG码头 OPTIMOOR length of berth LNG wharf
  • 相关文献

参考文献5

  • 1OCIMF. Mooring Equipment Guidelines[S]. Wither by Seamanship International, Livingston, UK, 2008.
  • 2BS6349: Part 4: 1994, Maritime structures. Code of practice for design of rendering and mooring systems[S].
  • 3JTS165-2013海港总体设计规范[S].北京:人民交通出版社,2014.
  • 4JTJ295-2000开敞式码头设计与施工技术规程[S].北京:人民交通出版社.2001.
  • 5JTJ211-99海港总平面设计规范[S].北京:人民交通出版社.1999.

共引文献19

同被引文献37

引证文献8

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部