Safety Limitations of Large New-Built Seagoing Vessels Towed through Bridge Area 被引量:1

Safety Limitations of Large New-Built Seagoing Vessels Towed through Bridge Area
原文传递
导出
摘要 The safety limitation of large new-built seagoing ves- sel design and operation is investigated to ensure safety of the new vessels towed through bridge area. We analyze the maneuverabil- ity characteristics of a towing fleet, and develop a mathematical drift model of ship motion for the fleet. Based on this drift model and the hydro-meteorological conditions in bridge area, we pro- pose a method to systematically ascertain the safety limitations of water stages, current, wind, speed and visibility. This method is conducive to the safety of both navigation and bridges when large towing fleets transit through bridges. The safety limitation of large new-built seagoing ves- sel design and operation is investigated to ensure safety of the new vessels towed through bridge area. We analyze the maneuverabil- ity characteristics of a towing fleet, and develop a mathematical drift model of ship motion for the fleet. Based on this drift model and the hydro-meteorological conditions in bridge area, we pro- pose a method to systematically ascertain the safety limitations of water stages, current, wind, speed and visibility. This method is conducive to the safety of both navigation and bridges when large towing fleets transit through bridges.
出处 《Wuhan University Journal of Natural Sciences》 CAS CSCD 2015年第6期543-548,共6页 武汉大学学报(自然科学英文版)
基金 Supported by the Key Projects of Golden Waterway Transit Capacity Improving Technologies(201132822430)
关键词 large new-built seagoing vessel towing formation bridge area safety limitations large new-built seagoing vessel towing formation bridge area safety limitations