摘要
2002年12月国务院批复了《南水北调工程总体规划》,明确中线工程分两期建设。目前,一期工程已经通水。近年来,随着社会经济的快速发展,受水区的人口、生产规模、节水水平、人们对环境的要求都发生了变化,因此有必要根据新的情况对受水区的用水需求重新预测。分析了城市化发展和城镇用水变化的新形势,依据流域、区域水资源规划成果,提出了中线二期工程受水区需调水量,并与《南水北调中线工程规划》提出的二期需调水量进行对比,以供各方参考。
In December,12,2002,the State Council approved General Plan of S- N Water Diversion Project and decided to construct the project in 2 stages. Up to now,the first stage project had been completed for water diversion. In recent years,with the quick development of society and economy,the population scale,production scale,water saving level,demand of environment have changed greatly,so,it is necessary to re- forecast the water- use demand in the water service area according to the new situation. The new situations of the urban development and water use variation are analyzed; on the basis of the plans of the basin and region,the water demand in water service area to stage II works of the S- N Water Diversion is put forward and the analysis result is compared with the water diversion demand in General Plan of S- N Water Diversion Project to provide reference for all circles.
出处
《人民长江》
北大核心
2015年第24期21-23,共3页
Yangtze River
基金
国家"十一五"科技支撑计划课题"南水北调中线工程输水能力与冰害防治技术研究"(2006BAB04A12)
关键词
受水区
需水量分析
需调水量分析
南水北调中线工程
water service area
water demand analysis
water diversion demand analysis
Middle Rouce Project of South-to-North Water Diversion