摘要 目前水平压裂完井是生产页岩气的主要方法,大部分井都是用下桥塞和射孔的方法来完成压裂作业,当压裂作业后,用连续油管带马达去钻磨桥塞。国内页岩气开采单井下复合桥塞和钻桥塞数量在20个左右,对于施工作业方而言,提高钻塞作业效率是关键。通过对作业前准备和规划、钻磨设计、马达选择、液体的选择、钻压、短起次数和速度、钻磨期间是否让井生产、地面返排设备、施工紧急情况及数据分析等情况的详细分析,结合国内页岩气井的实际开发经验,不断改进创新,最终得到了一套适合国内页岩气开发过程中钻磨桥塞的推荐做法。 Recently shale gas has been mainly produced through horizontal fractural completion in China. In most of these completions,fracturing operation has been conducted by setting the plug and perforation. After fracturing,coiled tubing with motor has been applied in milling the plugs. Around 20 plugs in each well need to be set and milled during the development of shale gas,and so the plug removal process should be designed with maximum overall efficiency as the goal of operational crew. The best practices for milling plugs have been finally formed through constantly improvement and innovation of technology to satisfy the need of domestic shale gas development through the comprehensive analysis of pre- job plan,milling design,motor selection,fluid selection,weight on bit,wiper trip frequency & speed,whether the well is allowed to produce during the milling,the surface flowback equipment and operation emergency situation and data analysis,as well as the experience accumulated during the shale gas development at home.
出处 《钻采工艺》 CAS 北大核心 2016年第1期68-71,9,共4页 Drilling & Production Technology
关键词 页岩气 连续油管 钻磨桥塞 螺杆马达 磨鞋 shale gas coiled tubing plug milling motor mill
  • 相关文献

参考文献6

二级参考文献19

  • 1吕德贵,马小茂.连续油管屈服极限分析[J].石油机械,1994,22(9):35-41. 被引量:11
  • 2吴月先.连续油管井下作业范围扩大[J].石油矿场机械,2005,34(2):65-65. 被引量:2
  • 3李介士.水平井钻井宛井及增产技术[M].北京:石油工业出版社,1991..
  • 4黄志潜 高学和.连续油管作业技术文集[M].北京:石油工业出版社,1998.13-14.
  • 5The Composite Catalog of Oil Field Equipment & Service,Published by Word Oil, 1998 - 1999 : 584 - 595.
  • 6The Composite Catalog of Oil Field Equipment & Service,Published by World Oil, 2002/2003 : 555.
  • 7Hampton Fowler, Perry Caurville. Tapered coiled tubing reaches extreme depths. World Oil, 2005:81 - 83.
  • 8Crabtree A R, Gavin W. Coiled tubing in sour environments: theory and practice. SPE Drilling & Complection,March, 2005:71-80.
  • 9Coiled tubing BHA for underbalanced drilling. JPT, May,2005:18.
  • 101,Stefan miska.An improvedAnalysis of Axial Force Along Coiled Tubing in Inclined/Horizontal Wellbores.SPE 37056

共引文献232

同被引文献257

引证文献30

二级引证文献122

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部