摘要
获各琦铜矿原破碎生产线统设备老化、生产效率低、生产成本高,难以满足生产需要。通过对比分析不同技改方案的经济性指标,结果表明,先更换现有流程中两台细碎圆锥中的一台为最优方案。
The original crushing system in Huogeqi copper mine can' t meet the production requirement such as antiquated equipment, low production efficiency and high cost. The best plan will he gained by using one new cone crusher with high production efficiency to replace the older crusher in exiting crushing system which has two cone crushers through contrasting several technologic schemes.