4张新燕,何山,周培毅,等."Summarization and Study of Fault Diagnosis Technology of the Main Components of Wind Turbine Generator System" , 2008IEEE International Conference on Sustainable Energy Technology, Singapore, 978-1- 4244-1888-6/08/$25.00@2008IEEE, 1369-1372.
6RAN N S, TOY P, SCHENK K F. Expected energy production costs by the method of moments[J].IEEE Trans on Power Apparatus and Systems, 1980, 99(5): 1908-1917.
7STREMEL J P, JENKINS R T, BABB R A, et al. Production costing using the cumulant method of representing the equivalent load curve[J]. IEEE Trans on Power Apparatus and Systems, 1980, 99(5): 1947-1956.
8The Reliability Test System Task Force of the Application of Probability Methods Subcommittee. IEEE reliability test system[J]. IEEE Trans on Power Apparatus and Systems, 1979, 98(6): 2047-2054.
9BOWDEN G J, BARKER P R, SHESTOPAL V O, et al. The Weibull distribution function and wind power statisties [J].Wind Engineering, 1983, 7(2): 85-98.